MRL0001
  
AgencyMTBridgeNP79-34FCRUpgrade19341934Br # 317-3-3-13B054
MRL0002
  
AgencyMTSpurNP454-36FCRExtension19361939Extend spur, construct unloading platform, remove depot shelter17-3-3-68A067
MRL0003
  
AgencyMTSpurBN77-69RFA 51-61-77Retirement19771979Remove spur17-4-2-68A039
MRL0004
  
AlderMTFacilitiesNP582-30Construction19301930Wool warehouse16-3-2-45B111
MRL0005
  
AlderMTLoad/unload facilitiesNP545-39FCRConstruction19391939Additional ore-loading platform17-5-1-13B119
MRL0006
  
AlderMTGrade CrossingNP762-40FCRReplacement19401941At wye17-5-1-13B055
MRL0007
  
AlderMTBridgeNP214-50FCRReconstruction19521952Rebuild Br # 41 and construct WB flume17-5-3-68A111
MRL0008
  
AlderMTFacilitiesNP81-55FCRCancellation19551955Electric pump and water softener at depot16-5-2-13B097
MRL0009
  
AlderMTPropertyBN73-1356Purchase19731973Extension to Ruby Valley Branch16-3-3-45A001
MRL0010
  
Allen's SpurMTCulvertNP178-64FCRInstallation19641964State of Montana paying for installation of culvert and ditches for Highway F21716-3-2-68B016
MRL0011
  
AmsterdamMTSpurNP150-50FCRExtension19501950Mill track17-5-3-68A103
MRL0012
  
AmsterdamMTLoad/unload facilitiesBN86-657RFA 51-17-86Sold19861986Loading platform to Jim Veltkamp17-5-2-13A041
MRL0013
  
AnceneyMTLoad/unload facilitiesNP337-30Extension19301930Stock chute extension at Stock Pens 16-3-2-45B098
MRL0014
  
AnceneyMTLoad/unload facilitiesNP837-40FCRRemodel19401940Stockyard17-5-1-13B063
MRL0015
  
AnceneyMTLoad/unload facilitiesNP660-52FCRUpgrade19521952Water well for stockyard17-4-3-68B028
MRL0016
  
ArleeMTTrackNP7004-33FCRRelay19331933Curve17-3-3-13B041
MRL0017
  
ArleeMTBridgeNP65-34FCRUpgrade19341935Place two new piers to reinforce Br # 22 over Jocko River17-3-3-13B045
MRL0018
  
ArleeMTSpurNP158-43FCRRelay19431943Siding17-5-3-13A023
MRL0019
  
ArleeMTBuildingNP88-46FCRConstruction19461947Replace section house17-5-2-13B113
MRL0020
  
ArleeMTSpurNP315-46FCRExtension19461946For E Rother & Son17-5-2-13B145
MRL0021
  
ArleeMTSpurNP656-46FCRConstruction19461946For Schaefer Hitchcock Co17-5-2-13B184
MRL0022
  
ArleeMTTrackNP427-57FCRRetirement19571957Remove various tracks17-5-2-68B092
MRL0023
  
Arlee to DixonMTTrackNP432-44FCRReballasting19441946Br # 21, # 25 raised17-5-3-13A148
MRL0024
  
Arlee to RavalliMTBridgesBNRFA 51-0016-808024Maintenance19801980Br # 26 and Br # 3117-4-2-13B006
MRL0025
  
ArmintoMTBridgeBN2780Maintenance19751975Stringers16-4-1-68A013
MRL0026
  
ArmintoMTBridgeBN3032Maintenance19761976# 26916-4-1-68A056
MRL0027
  
ArmintoMTBridgeBN3035Maintenance19761976# 26916-4-1-68A061
MRL0028
  
ArnoldMTRip RapBNRFA 51-24-741818Maintenance19741974at Br # 13.317-4-1-68A002
MRL0029
  
AustinMTTrackNP7003-33FCRRelay19331933Curve17-3-3-13B040
MRL0030
  
AustinMTTrackNP176-A-34FCRRelay19331933with 130# rail17-3-3-13B073
MRL0031
  
AustinMTTrackNP135-A-35FCRRelay19351937Curve17-3-3-13B146
MRL0032
  
AustinMTTrackNP104-B-36FCRRelay19351936Curve17-3-3-68A025
MRL0033
  
AustinMTTrackNP106-37FCRRelay19361937Curve17-3-3-68A114
MRL0034
  
AustinMTTrackNP150-A-38FCRRelay19381938Passing track and spur17-5-1-13B152
MRL0035
  
AustinMTFacilitiesNP125-43FCRUpgrade19431944Replace water tanks17-5-3-13A020
MRL0036
  
AustinMTTrackNP388-45FCRRelocation19451948Lower track in Iron Ridge Tunnel17-5-2-13B058
MRL0037
  
AustinMTTrackNP191-55FCRExtension19541955Westward siding16-5-2-13B119
MRL0038
  
AustinMTSpurNP156-57FCRConstruction19571957Convert north siding to spur17-5-2-68B061
MRL0039
  
AustinMTFacilitiesNP349-61FCRCancellation19611963Drill well and install pressure water system for Signal Maintainer16-5-1-13A049
MRL0040
  
AustinMTTrackNP479-67Relay19671967Curves17-3-2-68A053
MRL0041
  
AustinMTTrackBNRFA 51-101-797861Relay19791980Curves16-5-1-68B076
MRL0042
  
Austin and SkylineMTTrackBNRFA 51-024-785372Relay19781978Curves16-5-1-68A033
MRL0043
  
Austin to NimrodMTTrackNP100-A-37FCRRelay19371937curve17-3-3-68A085
MRL0044
  
Austin to NimrodMTTrackNP100-B-37FCRRelay19371937curve17-3-3-68A086
MRL0045
  
Austin to NimrodMTTrackNP100-C-37FCRRelay19371937curve17-3-3-68A087
MRL0046
  
Austin to NimrodMTTrackNP100-D-37FCRRelay19371937curve17-3-3-68A088
MRL0047
  
Austin to NimrodMTTrackNP100-F-37FCRRelay19371937curve17-3-3-68A089
MRL0048
  
Austin to NimrodMTTrackNP100-G-37FCRRelay19371937curve17-3-3-68A090
MRL0049
  
Austin to NimrodMTTrackNP100-H-37FCRRelay19371937curve17-3-3-68A091
MRL0050
  
AvonMTTrackNP512-29Relay19291929Relay House track16-3-2-45B026
MRL0051
  
AvonMTTrackNP608-29Extension19291929Extend South passing siding16-3-2-45B030
MRL0052
  
AvonMTEquipmentNP386-35FCRInstallation19361937Stockyard scales17-3-3-13B174
MRL0053
  
AvonMTLoad/unload facilitiesNP486-40FCRConstruction19401940Ore loading platform17-5-1-13B027
MRL0054
  
AvonMTLoad/unload facilitiesNP31-44FCRExtension19441944Ore loading platform17-5-3-13A090
MRL0055
  
AvonMTSpurNP202-45FCRExtension19451945Siding17-5-2-13B033
MRL0056
  
AvonMTBridgeNP558-45Upgrade19471947Walkway on Br # 3717-5-2-13B072
MRL0057
  
AvonMTLoad/unload facilitiesNP682-49FCRConstruction19491949Additional ramp for ore-loading platform17-5-3-68A073
MRL0058
  
AvonMTSpurNP464-50FCRRetirement19501950Serving Avon Lumber Co17-5-3-68A145
MRL0059
  
AvonMTLoad/unload facilitiesNP57-56FCRExtension19561957Stockyard spur  16-5-2-13B008
MRL0060
  
AvonMTFacilitiesNP263-57FCRUpgrade19571958Drill well and install pressure water system17-5-2-68B075
MRL0061
  
AvonMTFacilitiesNP393-59FCRUpgrade19591959Drilled well, pumphouse, and pressure system 16-5-1-13B054
MRL0062
  
AvonMTGrade Crossing  NP103-64FCRUpgrade19601964Improve crossing and install flashing lights with gates.  See AFE 162-64 for easement to State of Montana16-3-2-68B004
MRL0063
  
AvonMTLoad/unload facilitiesNP370-61FCRCancellation19611962Improvements to ore loading platform16-5-1-13A054
MRL0064
  
AvonMTPropertyNP162-64Easement19641964Granting Easement to State of Montana for Highway Grade Crossing16-3-2-68B015
MRL0065
  
AvonMTEquipmentNP209-64FCRUpgrade19641964Replace 10 ton scale with 15 ton scale16-3-2-68B019
MRL0066
  
Avon  MTGrade CrossingNP764-52FCRInstallation19521953Automatic flashing light signals17-4-3-68B040
MRL0067
  
Avon  MTPropertyBN82-510RFA 51-0093-81Easement19811982US Hwy 12. provate crossing, and temporary construction permit17-5-1-13A035
MRL0068
  
Avon and BradleyMTEquipmentBN82-951RFA 51-0083-82Installation19821982Rail lubricators17-5-1-13A044
MRL0069
  
Avon and Gold CreekMTBridgesBNRFA 51-009-785999Maintenance19781981Renew deskc on Br # 37 and 59.116-5-1-68B022
MRL0070
  
Avon to BradleyMTTrackBNRFA 51-59-752615Relay19751975Curve17-4-1-68A045
MRL0071
  
BassMTSpurNP962-30Extension19301930Additional 120 feet siding16-3-2-45B135
MRL0072
  
BassMTSpurNP561-45FCRConstruction19451945For Hagen Bros potato warehouse17-5-2-13B075
MRL0074
  
BassMTSpurBN72-1490Abandonment19701973Remove spur and two turnouts17-3-3-13A032
MRL0075
  
BassMTSpurBN78-67(K)RFA 51-87-77Retirement19771979Remove portion of siding17-4-1-13B022
MRL0076
  
Beals and DawesMTSpurNP387-57FCRRetirement19571957Remove spurs17-5-2-68B089
MRL0077
  
BearmouthMTTrackNP609-29Extension19291929Extend Westward siding16-3-2-45B031
MRL0078
  
BearmouthMTTrackNP176-B-34FCRRelay19341934Curve17-3-3-13B074
MRL0079
  
BearmouthMTTrackNP104-I-36FCRRelay19361936Curve17-3-3-68A032
MRL0080
  
BearmouthMTLoad/unload facilitiesNP587-38FCRUpgrade19381939Electric lights at coal dock17-5-1-13B142
MRL0081
  
BearmouthMTLoad/unload facilitiesNP653-39FCRUpgrade19391940Electric lights at ore-loading platform17-5-1-13B129
MRL0082
  
BearmouthMTTrackNP719-40FCRRetirement19401940Remove house track17-5-1-13B049
MRL0083
  
BearmouthMTFacilitiesNP263-43FCRUpgrade19431944Water treating facilities17-5-3-13A038
MRL0084
  
BearmouthMTFacilitiesNP491-44FCRUpgrade19441945Replace water tank 17-5-3-13A156
MRL0085
  
BearmouthMTSpurNP204-45FCRExtension19451945Westward siding17-5-2-13B035
MRL0086
  
BearmouthMTLoad/unload facilitiesNP731-52FCRExtension19521952Stull Loading Skid17-4-3-68B037
MRL0087
  
BearmouthMTBuildingNP257-57FCRConstruction19571958Signal maintainer motor car house17-5-2-68B071
MRL0088
  
BearmouthMTBuildingNP453-57FCRRemodel19571958Bathroom at signal maintainers house17-5-2-68B094
MRL0089
  
BearmouthMTGrade CrossingNP392-68Installation19681968Automatic signals at MP 86+2624 Highway I-9016-3-2-45A002
MRL0090
  
BearmouthMTTrackBN70-61Installation19681971Fencing and seeding east and west16-3-2-45A103
MRL0091
  
BearmouthMTPropertyBN72-9158Easement19721972to State of Montana for I-90 Interstate Highway16-3-3-68B006
MRL0092
  
BearmouthMTBridgeBNRFA 51-016-797457Maintenance19791979Renew deck and walkway on Br # 87 over Clark Fork River16-5-1-68B064
MRL0093
  
BearmouthMTTrackBN7862Relay19791980Curve16-5-1-68B077
MRL0094
  
Bearmouth to WillisMTTrackNP285-45FCRRelay19451945Main line17-5-2-13B041
MRL0095
  
Bearmouth to WillisMTTrackNP343-45FCRReballasting19451945EB Main track17-5-2-13B055
MRL0096
  
Bearmouth, WinstonMTLoad/unload facilitiesNP642-A/B-46FCRRelocation19461946Move stockyard scale from Bearmouth to Winston17-5-2-13B181
MRL0097
  
Beaver CreekMTEquipmentBNRFA CM 72-741872Maintenance19741974Air conditioner for Beaver Creek microwave site17-4-1-68A010
MRL0098
  
BelgradeMTFacilitiesNP425-30Installation19301930Fence between MP 152-3200 and 436716-3-2-45B104
MRL0099
  
BelgradeMTStationNP553-30Replacement19301930Fire destroyed depot16-3-2-45B109
MRL0100
  
BelgradeMTTrackNP630-40FCRRetirement19401940Remove portion of house track17-5-1-13B040
MRL0101
  
BelgradeMTTrackNP170-50FCRExtension19501950House track17-5-3-68A109
MRL0102
  
BelgradeMTGrade CrossingNP471-54FCRUpgrade19541954Automatic flashing light signals at Broadway St17-5-2-68B011
MRL0103
  
BelgradeMTRip RapNP130-56FCRMaintenance19541955At Gallatin River16-5-2-13B014
MRL0104
  
BelgradeMTGrade CrossingNP37-60FCRUpgrade19601960Replace wig-wag signals with automatic flashing lights at Broadway16-5-1-45B022
MRL0105
  
BelgradeMTGrade CrossingNP83-65Installation19641965automatic signals and gates at Broadway St17-3-1-68B020
MRL0106
  
BelgradeMTSpurBN72-709Construction19711973To serve Peavey agri-business complex17-3-3-13A010
MRL0107
  
BelgradeMTSpurBN72-1627Retirement19731973704 feet and construct unloading ramp16-3-3-68B002
MRL0108
  
BelgradeMTGrade CrossingBN76-969Installation19761978Flashing lights and gate arms at Oregon St17-4-2-68A012
MRL0109
  
Belgrade and LoganMTFacilitiesNP714-44FCRRelocation19441948Section house from Belgrade to Logan17-5-2-13B007
MRL0110
  
Belgrade and ManhattanMTCulvertBN70-433Upgrade19701970Replace culverts17-3-3-68B027
MRL0111
  
Belgrade to LoganMTTrackNP114-39FCRRelay19391939Curves17-5-1-13B079
MRL0112
  
Belgrade to LoganMTTrackBN86-185RFA 50-003-86Relay19851986Main line17-5-2-13A015
MRL0113
  
Belknap to NoxonMTTrackNP123-A/B-61FCRReconstruction19551957Line change for Noxon Rapids Dam, and relocation of various facilities16-5-1-13A023
MRL0114
  
Big HornMTSpurNP279-60FCRG1021Extension19601960Extend Beet Spur Loading Track16-3-1-13B015
MRL0115
  
Big TimberMTGrade CrossingNP168-46FCRConstruction19461947Automatic crossing signals at McLeod St, close Anderson St, rearrange loading facilities17-5-2-13B141
MRL0116
  
Big TimberMTSpurNP313-49FCRRetirement19491949Remove siding17-5-3-68A029
MRL0117
  
Big TimberMTTrackNP513-49 (1)FCRRelay19491949House track17-5-3-68A050
MRL0118
  
Big TimberMTFacilitiesNP283-52Upgrade19521952Connect section facilities to city water16-3-3-13B019
MRL0119
  
Big TimberMTStationNPG863Upgrade19551955replace depot roof17-3-1-68A030
MRL0120
  
Big TimberMTCulvertNP288-D-56FCRUpgrade19551956Replace stone arch with CMP16-5-2-13B040
MRL0121
  
Big TimberMTLoad/unload facilitiesNP130-55FCRUpgrade19551955Improvements to stockyard16-5-2-13B103
MRL0122
  
Big TimberMTSpurNP90-56FCRRelay19561956Stockyard track16-5-2-13B016
MRL0123
  
Big TimberMTLoad/unload facilitiesNP91-57FCRG948Reconstruction19571957Replace unloading platform16-3-1-45B042
MRL0124
  
Big TimberMTPropertyNP201-62FCRSold19611962Wool warehouse to Sweetgrass Wool Marketing Association17-5-1-68A001
MRL0125
  
Big TimberMTTrackNP208-63FCRUpgrade19631963Track changes to facilitate switching17-5-1-68A033
MRL0126
  
Big TimberMTEquipmentNP16-65G1133Replacement19651965replace stock scale in new location17-3-1-68B001
MRL0127
  
Big TimberMTLoad/unload facilitiesNP432-68Extension19681968Extend raised dock into warehouse16-3-2-45A007
MRL0128
  
Big TimberMTBuildingsNP27-68Replacement19681968Motor car and tool house16-3-2-13A019
MRL0129
  
Big TimberMTRoadwayBNNotification19751976State to place guardrail along Hwy 191 at Br # 79.117-3-2-68B021
MRL0130
  
Big TimberMTPropertyBNH-BR. 79.1Easement19761976Underpass of Hwy 191 by State17-3-2-13A001
MRL0131
  
Big TimberMTBridgeBN77-988Upgrade19771978Railing and walkway for Br # 7917-4-3-68A003
MRL0132
  
Big TimberMTBridgeBNRFA 51-0010-808022Maintenance19801980Repair piers Br # 8717-4-2-13B004
MRL0133
  
Big Timber  MTStationNP226-49FCRRemodel19491949Extend station platform17-5-3-68A011
MRL0134
  
Big Timber to EltonMTTrackNP311-52Reballasting19521952Includes bankwidening 16-3-3-13B021
MRL0135
  
Big Timber to GreycliffMTPropertyBN78-941Easement19781982For I-90 construction.  Includes grade crossing and drainage revisions17-5-3-13B001
MRL0136
  
Big Timber to KootenaiMT IDTrackBN86-242RFA 50-08-86Relay19851986Curves17-5-2-13A009
MRL0137
  
BillingsMTGrade CrossingNP797-51Upgrade1950195016-3-3-13B003
MRL0138
  
BillingsMTFacilitiesNPG 997-ANotification19501958Gas line for Montana Power Co Bird steam plant 17-3-2-13B010
MRL0139
  
BillingsMTSpurNP293-51Construction19511951Ryan Grocery 16-3-3-13A013
MRL0140
  
BillingsMTEquipmentNP567B-51Installation19511951Telephone switching circuit16-3-3-13A022
MRL0141
  
BillingsMTTrackNP615-51Retirement19511951and extend passing track16-3-3-13A023
MRL0142
  
BillingsMTBuildingsNP697-51Remodel19511952Toilet for section men16-3-3-13A024
MRL0143
  
BillingsMTSpurNP798-51Retirement19511951to Crane Co.16-3-3-13B004
MRL0144
  
BillingsMTSpurNPInspection19511951proposal for Armco Co.16-3-3-13B006
MRL0145
  
BillingsMTSurveyNPInspection19511951Spur for Occident Milling Co,16-3-3-13B009
MRL0146
  
BillingsMTSurveyNPNotification19511966Properties adjacent to Continental Oil Refinery17-3-2-13B007
MRL0147
  
BillingsMTSpurNP638-53FCRG767Extension19511954For Artificial Ice and Cold Storage Co17-5-1-68B007
MRL0148
  
BillingsMTRoadwayNPConstruction19521952connect to NP right of way at Montana Ave16-3-3-13B008
MRL0149
  
BillingsMTTrackNP149-52Relay19521952East Switching Lead and Ladder joint with  CB&Q and GN16-3-3-13B015
MRL0150
  
BillingsMTTrackNP150-52Relay19521952East Switching Lead and Ladder joint with  CB&Q and GN16-3-3-13B017
MRL0151
  
BillingsMTTrackNP151-52Relay19521952Numbers 1 and 3 in Old Yard Joint  with CB&Q and GN16-3-3-13B018
MRL0152
  
BillingsMTBuildingsNP14-52Construction19521952for Ice house and coal storage 16-3-3-13B030
MRL0153
  
BillingsMTRoadwayNP373-52Installation19521952Paving and fencing for NP Transport Garage16-3-3-13B037
MRL0154
  
BillingsMTSpurNP478-52Installation19521952for Russell Miller Milling Co.16-3-3-13B038
MRL0155
  
BillingsMTStationNP262-53Remodel19521954for Railway Express and joint with  CB&Q and GN16-3-3-13B043
MRL0156
  
BillingsMTTrackNP183C-53Upgrade19521952Tie plates, joint with  CB&Q and GN16-3-3-13B046
MRL0157
  
BillingsMTOverpassNPG747Construction1952195213th St subway17-5-1-68B004
MRL0158
  
BillingsMTFacilitiesNP627-52G770Upgrade19521952Convert boilers in power plant to natural gas17-5-1-68B010
MRL0159
  
BillingsMTBuildingsNPUpgrade19531953Freight house toilet16-3-3-13B045
MRL0160
  
BillingsMTSpurNP781Reconstruction19531953for Linde Air Products16-4-1-68B008
MRL0161
  
BillingsMTSpurNP782Reconstruction19531953Install drainage for Lovell Clay Products  16-4-1-68B009
MRL0162
  
BillingsMTSpurNP654-53Extension19531953Central Distributing16-4-1-68B010
MRL0163
  
BillingsMTPropertyNPG786Easement19531953Granted to City of Billings for water line16-4-1-68B011
MRL0164
  
BillingsMTFacilitiesNPG792Construction19531953Sanitary sewer16-4-1-68B013
MRL0165
  
BillingsMTGrade CrossingNP562-54G836Installation19531955Automatic crossing signals at Minnesota Ave (10% NP/90% State)17-3-1-68A006
MRL0166
  
BillingsMTPropertyNP309-53FCRG757Sold19531953For Armco Drainage and Metal Products Co17-5-1-68B006
MRL0167
  
BillingsMTBuildingNP653-53FCRG772Extension19531955Freight house  17-5-1-68B011
MRL0168
  
BillingsMTFacilitiesNP265-53FCRG774Upgrade19531953Convert coachyard power plant to natural gas17-5-1-68B013
MRL0169
  
BillingsMTEquipmentNP543-54Replacement19541954Lift trucks at Freight House16-3-3-13B027
MRL0170
  
BillingsMTRoadwayNP289-54Upgrade19541954Driveway16-3-3-13B036
MRL0171
  
BillingsMTFacilitiesNP85-54Construction19541954Metal Building for diesel fueling and sanding16-4-1-68B012
MRL0172
  
BillingsMTEquipmentNP82-54Replacement19541954Smoke jack for Diesel Head Stack16-4-1-68B016
MRL0173
  
BillingsMTBuildingsNP795Remodel19541954Office move to 2nd floor16-4-1-68B017
MRL0174
  
BillingsMTEquipmentNP729-53Purchase19541954Office equipment & Automobile16-4-1-68B019
MRL0175
  
BillingsMTTrackNP84-54Extension19541954in New Yard16-4-1-68B020
MRL0176
  
BillingsMTTrackNP83-54Construction19541954Caboose track, joint with GN and CB & Q16-4-1-68B021
MRL0177
  
BillingsMTGrade CrossingNP171-54Installation19541954Plank crossing at 27th St. Joint with GN and CB & Q16-4-1-68B022
MRL0178
  
BillingsMTStationNP68-54Construction19541954Water treatment plant. Join with GN and CB & Q16-4-1-68B027
MRL0179
  
BillingsMTSpurNP98-54Extension19541954Joint with GN and CB & Q16-4-1-68B028
MRL0180
  
BillingsMTGrade CrossingNPG809Installation19541954Proposal for crossing at Mary Street16-4-1-68B032
MRL0181
  
BillingsMTSignalsNP116-54Replacement19541954Joint with GN and CB & Q16-4-1-68B034
MRL0182
  
BillingsMTBridgeNPG815Replacement1954195416-4-1-68B037
MRL0183
  
BillingsMTBuildingsNP306-54Remodel19541955Lavatory and Switchman's building. Joint with GN and CB & Q16-4-1-68B040
MRL0184
  
BillingsMTCulvertsNPG827Reconstruction19541954Huntley Irrigation District16-4-1-68B048
MRL0185
  
BillingsMTSpurNPG828Construction19541954to serve Beall Pipe & Tank17-3-1-68A001
MRL0186
  
BillingsMTBuildingsNPG841Relocation19541954relocate four Company buildings17-3-1-68A010
MRL0187
  
BillingsMTGrade CrossingNP631-54G844Upgrade19541955add lighting, joint with CB &Q17-3-1-68A013
MRL0188
  
BillingsMTTrackNP220-55G856Retirement19541955remove yard tracks at roundhouse17-3-1-68A024
MRL0189
  
BillingsMTBuildingNP64-57G882Construction19541956for Ryan Wholesale Grocers17-3-1-68A042
MRL0190
  
BillingsMTSpurNP337-54FCRG767Construction19541954For Nehi Beverage Co.17-5-1-68B008
MRL0191
  
BillingsMTFacilitiesNP289-54G744Installation19541954Improve driveway to NPT17-5-1-68B014
MRL0192
  
BillingsMTGrade CrossingNP700-57FCRConstruction19541960Laurel-Billings Road17-5-2-68A023
MRL0193
  
BillingsMTBuildingNP451-56FCRG894Remodel19551956Acquire and remodel Egge Building for use as Post Office Terminal16-3-1-45B001
MRL0194
  
BillingsMTSpurNPG895Survey1955Survey for spur to serve Industrial Equip Co16-3-1-45B002
MRL0195
  
BillingsMTBridgeNPG896Construction1955Request to build bridge at Hogan Slough16-3-1-45B003
MRL0196
  
BillingsMTFacilitiesNP328-54Abandonment19551955Steam Locomotive 16-4-1-68B041
MRL0197
  
BillingsMTFacilitiesNP647-55Replacement19551955Water line at Industrial site joint with GN and CB & Q16-4-1-68B043
MRL0198
  
BillingsMTEquipmentNP614-A-54G845Retirement  19551955retire shaper, transfer to Tacoma17-3-1-68A014
MRL0199
  
BillingsMTBuildingsNPG846Construction19551969construct warehouse, replace roof at Interstate Beer17-3-1-68A015
MRL0200
  
BillingsMTSpurNP222-55G847Construction19551955for Massey, Harris and Ferguson17-3-1-68A016
MRL0201
  
BillingsMTSpurNP11A-55G850Relay19551955lead to Great Western Sugar, joint with CB & Q17-3-1-68A019
MRL0202
  
BillingsMTEquipmentNP78-55G852Retirement  19551955acquired new office equipment17-3-1-68A020
MRL0203
  
BillingsMTRoadwayNPG871Construction19551955extend Charles St for Ziegler Lumber Co17-3-1-68A034
MRL0204
  
BillingsMTLegal actionNPG873Defense19551955Accident at Carter Oil crossing; case dismissed17-3-1-68A037
MRL0205
  
BillingsMTSpurNP648-55G878Construction19551965for Building Services and Boise Cascade17-3-1-68A041
MRL0206
  
BillingsMTSpurNP516-55G885Extension19551956includes culvert extension for Ryan Groc17-3-1-68A044
MRL0207
  
BillingsMTDrainageNPG885Upgrade19551957includes new bridge on Shepard Branch17-3-1-68A045
MRL0208
  
BillingsMTFacilitiesNP301-56FCRG902Upgrade19561956Install 12 inch water line to serve Industrial site16-3-1-45B008
MRL0209
  
BillingsMTOverpassNPG904Construction1956Highway Department proposal for 4 lane highway overpass (over RR)16-3-1-45B009
MRL0210
  
BillingsMTSpurNP352-56FCRG905Construction19561956to serve Independent Wholesale Grocers Inc.16-3-1-45B010
MRL0211
  
BillingsMTSpurNP21-57FCRG914Construction19561957For O. E. Lee; includes bridge removal16-3-1-45B018
MRL0212
  
BillingsMTBuildingNP211-56FCRG919Remodel19561956Changes in roundhouse to serve NPT16-3-1-45B021
MRL0213
  
BillingsMTSpurNPG936Notification19561956Proposal by Lumber Enterprises Inc16-3-1-45B033
MRL0214
  
BillingsMTSpurNP70-49G944Construction19561970For Great Western Sugar Co (includes AFE 120-68)16-3-1-45B039
MRL0215
  
BillingsMTFacilitiesNP119-57G833Construction19561957new turntable curb17-3-1-68A004
MRL0216
  
BillingsMTFacilitiesNPG879Construction19561957utilities and infrastructure for industrial site17-3-1-68A040
MRL0217
  
BillingsMTTrackNP20-57FCRG943Construction19571957Construct cross-over at industrial site with G.N. &C.B. & Q.16-3-1-45B038
MRL0218
  
BillingsMTFacilitiesNP88-57FCRG951Construction19571958Build facility for handling Engine Sand16-3-1-45B045
MRL0219
  
BillingsMTPropertyNPG953Transfer19571962Easement for roadway and sewer extension to industrial sites16-3-1-45B046
MRL0220
  
BillingsMTTrackNP151-57FCRG955Retirement19571957Remove House track # 416-3-1-45B048
MRL0221
  
BillingsMTSpurNP354-57FCRG957Construction19571957Spur track for Par Distributing Co. 16-3-2-68A001
MRL0222
  
BillingsMTSpurNP505-57Construction19571957Install spur Track for Great Western Sugar Co.16-3-2-68A007
Joint with Great Western Sugar Co.
MRL0223
  
BillingsMTPavingNP552-57Installation19571957Parking area for H.P. Transport Co.16-3-2-68A015
MRL0224
  
BillingsMTLoad/unload facilitiesNPG962Notification19571959Correspondence regarding Surecrete platform16-3-2-68A021
MRL0225
  
BillingsMTGrade CrossingNPG967Maintenance19571957Mary Street crossing 16-3-2-68A022
MRL0226
  
BillingsMTSpurNPG969Construction19571957Spur for Winter Hardware and Great Western Sugar16-3-2-68A023
MRL0227
  
BillingsMTBuildingsNPG970Upgrade19571957Placing of Surecrete at Freight Building16-3-2-68A024
MRL0228
  
BillingsMTTrackNP52-59G-1005Relay19571960At Great Western Sugar Co17-3-2-13B018
MRL0229
  
BillingsMTSpurNP135-58FCRG920Construction19581958For Midland Implement Co.16-3-1-45B022
MRL0230
  
BillingsMTFacilitiesNP15-58FCRG941Upgrade19581958Washing and Refueling Platform at NP Transport Garage16-3-1-45B036
MRL0231
  
BillingsMTPropertyNP712-57G961Sold19581958Relocating fence in stock yard for sale to State of Montana16-3-2-68A005
MRL0232
  
BillingsMTLoad/unload facilitiesNP115-58Upgrade19581958Pave portion of stockyard16-3-2-68A009
MRL0233
  
BillingsMTSpurNP373-58Installation19581958Reinstall Track on Limrock Trestle at Great Western Sugar Co. Plant16-3-2-68A011
MRL0234
  
BillingsMTRoadwayNP417-61Construction19581963Highway underpass.  See Notes16-3-2-68A030
Joint Operation with Great Northern and Chicago Burlington and Quincy
MRL0235
  
BillingsMTLoad/unload facilitiesNPG993Reconstruction19581958Renew a portion of the Carter ramp (old brickyard spur), including reconstruction of retaining wall17-3-2-13B001
MRL0236
  
BillingsMTLoad/unload facilitiesNP483-67G996Upgrade19581967for United Building Centers use in unloading lumber cars, included plank crossing17-3-2-13B004
MRL0237
  
BillingsMTSpurNPG 997-ANotification19581960Agreement for Montana Power Co spur for Bird steam plant17-3-2-13B009
MRL0238
  
BillingsMTSpurNP71-969G 997-AConstruction19581967Spur from Montana Power Co tracks17-3-2-13B011
MRL0239
  
BillingsMTEquipmentNPG-998Upgrade19581960Replace gas burners after power plant explosion17-3-2-13B015
MRL0240
  
BillingsMTTrackNP32-60FCRG1017Relay19601961Relay cross-over and West Ladder Track of New Yard Including 7 turnouts16-3-1-13B011
MRL0241
  
BillingsMTStationNP443-61FCRG1020Remodel19601961Passenger Station Waiting Room & Ticket Office16-3-1-13B014
MRL0242
  
BillingsMTEquipmentNP193-60FCRG1025Installation19601960Install mechanical Refrigeration in Freight House 16-3-1-45A001
MRL0243
  
BillingsMTTrackNP330-60Relay19601960to Livingston Tangent 11 & 1216-3-1-68A006
Joint Operation with Great Northern and Chicago Burlington and Quincy
MRL0244
  
BillingsMTSpurNP370-60Extension19601960Great Western Sugar Co16-3-1-68A007
Joint Operation with Great Northern and Chicago Burlington and Quincy
MRL0245
  
BillingsMTIrrigation DitchNPG1039Easement19601962State of Montana proposed easement on NP right of way for irrigation ditch16-3-1-68A009
 
MRL0246
  
BillingsMTOverpassNP124-64Construction19601965NP assumed 10% of construction costs16-3-1-68A010
Joint Operation with Great Northern and Chicago Burlington and Quincy
MRL0247
  
BillingsMTGrade CrossingNP527-60Installation19601961Install Automatic Flashing light at crossing16-3-1-68A015
Joint Operation with Great Northern and Chicago Burlington and Quincy
MRL0248
  
BillingsMTBuildingsNPG994Upgrade19601960Order adapters for exhaust fan system at NP Transport garage17-3-2-13B002
MRL0249
  
BillingsMTSpurNP70-70, 163-60G 997Upgrade19601971Extend Montana Power Co spur17-3-2-13B013
MRL0250
  
BillingsMTSurveyBN 163-60G 997-ANotification19601971Alternatives for industry track configuration17-3-2-13B014
MRL0251
  
BillingsMTTrackNP20-61FCRG1026Installation19611961Install crossover near Continental Oil Co. Spur16-3-1-45A002