Complete Set
  
  
  
  
  
Count= 533
  
DepotS-26-112/28/18897/8/1892Standard Plan of 1st Class Combination DepotGround Plan
S-26-1, 2, 3, 7, 8 & 19
NPL P Schrenk18x24Chief EngineerS-26-1.1889.rev1892.1st Class Combo.Schr.tif
  
DepotS-26-212/28/18897/8/1891Standard Plan of 1st Class Combination DepotFront Elevation, Framing Plans, Sections
S-26-1, 2, 3, 7, 8 & 19
NPL P Schrenk18x24Chief EngineerS-26-2.1889.rev1891.1st Class Combo.Schr.tif
  
DepotS-26-312/28/18898/17/1896Standard Plan of 1st Class Combination Depot Bill of MaterialBill of Material
S-26-1, 2, 3, 7, 8 & 19 (1st Class)
S-26-3, 7, 19, 20, 21, & 24 (Class A)
NPL P Schrenk18x24Chief EngineerS-26-3.1889.rev1896.1st Class Combo BillMtl.Schr.tif
  
DepotS-26-412/28/18897/8/1892Standard Plan of 2nd Class Combination DepotGround Plan, Section,
S-26-4, 5, 6, 7, 8, & 19
NPL P Schrenk18x24Chief EngineerS-26-4.1889.rev1892.2nd Class Combo.Schr.tif
  
DepotS-26-512/28/18897/8/1891Standard Plan of 2nd Class Combination DepotFront and End Elevations, Sections, Framing Plans
S-26-4, 5, 6, 7, 8, & 19
NPL P Schrenk18x24Chief EngineerS-26-5.1889.rev1891.2nd Class Combo.Schr.tif
  
DepotS-26-612/28/18898/17/1896Standard Plan of 2nd Class Combination Depot Bill of MaterialBill of Material
S-26-4, 5, 6, 7, 8, & 19 (2nd Class)
S-26-6, 7, 19, 22, 23 & 24 (Class "B")
NPL P Schrenk18x24Chief EngineerS-26-6.1889.rev1896.2nd Class Combo BillMtl.Schr.tif
  
DepotS-26-712/28/18893/25/1892Standard Plan of Details for Combination DepotsBay Windows, Ticket Windows, Doors, Eave Brackets
S-26-1, 2, 3, 7, 8 & 19 First Class)
S-26-4, 5, 6, 7, 8 & 19 (Second Class)
S-26-3, 7, 19, 20, 21, & 24 (Class "A")
S-26-6, 7, 19, 22, 23, & 24 (Class "B")
S-26-7, 19, 24, 33, 34, & 35 (Class "B" 2-Story)
NPL P Schrenk18x24Chief EngineerS-26-7.1889.rev1892.Combo Depot Details.Schr.tif
  
DepotS-26-812/28/1889n/aStandard Plan of Details for Combination DepotsDetail of Sliding Door, Wall Section, Mouldings
S-26-1, 2, 3, 7, 8 & 19 First Class)
S-26-4, 5, 6, 7, 8 & 19 (Second Class)
NPL P Schrenk18x24Chief EngineerS-26-8.1889.Combo Details.Schr.tif
  
DepotS-26-912/28/18897/8/1892Standard Plan of 3rd Class Combination DepotGround Plan
S-26-9, 10, 11, 12, 13, & 19
NPL P Schrenk18x24Chief EngineerS-26-9.1889.rev1892.3rd Class Combo.Schr.tif
  
DepotS-26-1012/28/18897/8/1891Standard Plan of Details for 3rd Class Combination DepotFront and End Elevations, Sections, Framing Plans
S-26-9, 10, 11, 12, 13, & 19
NPL P Schrenk18x24Chief EngineerS-26-10.1889.rev1891.3rd Class Combo.Schr.tif
  
DepotS-26-1112/28/18893/25/1892Standard Plan of Details for 3rd Class Combination DepotDoor Plans, Wall Sections
S-26-9, 10, 11, 12, 13, & 19
NPL P Schrenk18x24Chief EngineerS-26-11.1889.rev1892.3rd Class Combo Details.Schr.tif
  
DepotS-26-1212/28/1889n/aStandard Plan of Details for 3rd Class Combination DepotDetails of Bay Window, Slat Partition, Doors, Eave Brackets
S-26-9, 10, 11, 12, 13, & 19 (3rd Class) S-26-12, 13, 19, 25, 26, & 27 (Class "C")
NPL P Schrenk18x24Chief EngineerS-26-12.1889.3rd Class Combo Details.Schr.tif
  
DepotS-26-1312/28/18898/17/1896Standard Plan of 3rd Class Combination Depot Bill of MaterialBill of Material
S-26-9, 10, 11, 12, 13, & 19 (3rd Class) S-26-12, 13, 19, 25, 26, & 27 (Class "C")
NPL P Schrenk18x24Chief EngineerS-26-13.1889.rev1896.3rd Class Combo BillMtl.Schr.tif
  
DepotS-26-1412/28/18897/8/1892Standard Plan of 3rd Class Combination DepotGround Plan, Second Floor Plan, Front and End Elevation
S-26-14, 15, 16, 17, 18, & 19
NPL P Schrenk18x24Chief EngineerS-26-14.1889.rev1892.3rd Class Combo.Schr.tif
  
DepotS-26-1512/28/18897/8/1891Standard Plan of 3rd Class 2-Story Combination Depot Front and End Elevations, Sections, Stair Detail
S-26-14, 15, 16, 17, 18 & 19
NPL P Schrenk18x24Chief EngineerS-26-15.1889.rev1891.3rd Class Combo 2Story.Schr.tif
  
DepotS-26-1612/28/1889n/aStandard Plan of 3rd Class 2-Story Combination Depot DetailsElevation  and Section of Wall,  Door, Mouldings
S-26-14, 15, 16, 17, 18 & 19
NPL P Schrenk18x24Chief EngineerS-26-16.1889.3rd Class Combo 2Story Details.Schr.tif
  
DepotS-26-1712/28/18893/25/1892Standard Plan of 3rd Class 2-Story Combination Depot DetailsDetails of Bay Window, Slat Partition, Doors, Eave Brackets
S-26-14, 15, 16, 17, 18 & 19 (3rd Class 2-Story) S-26-17, 18, 19, 28, 29 & 30 (Class "C" 2-Story)
NPL P Schrenk18x24Chief EngineerS-26-17.1889.rev1892.3rd Class Combo 2Story Details.Schr.tif
  
DepotS-26-1812/28/18898/17/1896Standard Plan of 3rd Class 2-Story Combination Depot Bill of MaterialBill of Material
S-26-14, 15, 16, 17, 18 & 19 (3rd Class 2-Story) S-26-17, 18, 19, 28, 29 & 30 (Class "C" 2-Story)
NPL P Schrenk18x24Chief EngineerS-26-18.1889.rev1896.3rd Class Combo 2Story BillMtl.Schr.tif
  
DepotS-26-1912/28/18897/8/1891Standard Plan of Operators Table for StationsPlan and Section Views of Operators Table
S-26-1, 2, 3, 7, 8 & 19 (1st Class Comb Depot) S-26-4, 5, 6, 7, 8 & 19 (2nd Class Comb Depot) S-26-9, 10, 11, 12, 13, & 19 (3rd Class Comb Depot) S-26-3, 7, 19, 20, 21, & 24 (Class "A" Comb Depot) S-26-6, 7, 19, 22, 23, & 24 (Class "B" Comb Depot) S-26-7, 19, 24, 33, 34, & 35 (Class "B" 2-Story) S-26-12, 13, 19, 25, 26, & 27 (Class "C" Comb Depot) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (Class "C" 2-Story) S-28-1, 2, 3, 4, 5, 6 & S-26-19(1st Class Brick Pass.) S-28-7, 8, 9, 10, 11 & S-26-19 (1st Class Frame Pass.) S-28-12, 13, 14, 15, 16 & S-26-19 (2nd Class Frame Pass.)
NPL P Schrenk18x24Chief EngineerS-26-19.1889.rev1891.OperatorsTable.Schr.tif
  
DepotS-26-203/12/18907/8/1892Standard Plan of Class A Combination Depot Ground Plan
S-26-3, 7, 19, 20, 21 & 24
NPL P Schrenk18x24Chief EngineerS-26-20.1890.rev1892.Class A Combo.Schr.tif
  
DepotS-26-213/12/18907/8/1891Standard Plan of Class A Combination Depot Front and End Elevation, Framing Plans, Sections
S-26-3, 7, 19, 20, 21 & 24
NPL P Schrenk18x24Chief EngineerS-26-21.1890.rev1891.Class A Combo.Schr.tif
  
DepotS-26-223/12/18907/8/1892Standard Plan of Class B Combination Depot Ground Plan, Section, Rafter Detail
S-26-6, 7, 19, 22, 23 & 24
NPL P Schrenk18x24Chief EngineerS-26-22.1890.rev1892.Class B Combo.Schr.tif
  
DepotS-26-233/12/18907/8/1891Standard Plan of Class B Combination Depot Front and End Elevations, Framing, Sections
S-26-6, 7, 19, 22, 23 & 24
NPL P Schrenk18x24Chief EngineerS-26-23.1890.rev1891.Class B Combo.Schr.tif
  
DepotS-26-243/12/1890n/aStandard Plan of Details for Combination DepotsDetails of Sliding Door, Wall Section, Mouldings
S-26-3, 7, 19, 20, 21 & 24 (Class "A")
S-26-6, 7, 19, 22, 23 & 24 (Class "B")
S-26-7, 19, 24, 33, 34 & 35 (Class "B" 2-Story)
NPL P Schrenk18x24Chief EngineerS-26-24.1890.Combo Depot Details.Schr.tif
  
DepotS-26-253/12/18907/8/1892Standard Plan of Class C Combination Depot Ground Plan
S-26-12, 13, 19, 25, 26, & 27
NPL P Schrenk18x24Chief EngineerS-26-25.1890.rev1892.Class C Combo.Schr.tif
  
DepotS-26-265/6/18907/8/1891Standard Plan of Class C Combination Depot Front and End Elevations, Framing, Sections
S-26-12, 13, 19, 25, 26, & 27
NPL P Schrenk18x24Chief EngineerS-26-26.1890.rev1891.Class C Combo.tif
  
DepotS-26-273/12/18907/8/1892Standard Plan of Details for Class C  Combination DepotsDetails of  Doors, Wall Sections
S-26-12, 13, 19, 25, 26, & 27
NPL P Schrenk18x24Chief EngineerS-26-27.1890.rev1892.Class C Combo Details.Schr.tif
  
DepotS-26-283/12/18907/8/1892Standard Plan of Class C 2-Story Combination DepotGround Plan, 2nd Floor Plan, Elevations
S-26-17, 18, 19, 28, 29 & 30
NPL P Schrenk18x24Chief EngineerS-26-28.1890.rev1892.Class C Combo 2Story.Schr.tif
  
DepotS-26-295/6/18907/8/1891Standard Plan of Class C 2-Story Combination DepotFront and End Elevations, Framing, Sections, Stair Detail
S-26-17, 18, 19, 28, 29 & 30
NPL P Schrenk18x24Chief EngineerS-26-29.1890.rev1891.Class C Combo 2Story.Schr.tif
  
DepotS-26-303/12/1890n/aStandard Plan of Class C 2-Story Combination Depot DetailsDetails of Sliding Door, Wall Section, Mouldings
S-26-17, 18, 19, 28, 29 & 30
NPL P Schrenk18x24Chief EngineerS-26-30.1890.Class C Combo 2Story Details.tif
  
DepotS-26-314/4/18907/8/1892Standard Plan of 4th Class Combination Depot Ground Plan, Elevations, Sections, Framing
S-26-31 & 32
NPL P Schrenk18x24Chief EngineerS-26-31.1890.rev1892.4th Class Combo.Schr.tif
  
DepotS-26-324/4/18907/8/1892Standard Plan of 4th Class Combination Depot DetailsDetails of Slat Partition, Sliding Freight Doork Moulding, Bill of Material
S-26-31 & 32
NPL P Schrenk18x24Chief EngineerS-26-32.1890.rev1892.4th Class Combo Details.Schr.tif
  
DepotS-26-335/6/18907/8/1892Standard Plan of Class B 2-Story Combination Depot Ground Plan, 2nd Floor Plan, Detail of Awning
S-26-7, 19, 24, 33, 34 & 35
NPL P Schrenk18x24Chief EngineerS-26-33.1890.rev1892.Class B 2Story Combo.Schr.tif
  
DepotS-26-345/6/18907/8/1891Standard Plan of Class B 2-Story Combination Depot Front and End Elevations, Sections, Stair Detail
S-26-7, 19, 24, 33, 34 & 35
NPL P Schrenk18x24Chief EngineerS-26-34.1890.rev1891.Class B 2Story Combo.Schr.tif
  
DepotS-26-355/6/18908/17/1896Standard Plan of Class B 2-Story Combination Depot Bill of Material
S-26-7, 19, 24, 33, 34 & 35
NPL P Schrenk18x24Chief EngineerS-26-35.1890.rev1896.Class B 2Story Combo BillMtl.Schr.tif
  
DepotS-28-112/28/18897/8/1892Standard Plan of 1st Class Brick Passenger StationGround Plan
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-1.1889.rev1892.Brick Psgr 1st Class.Schr.tif
  
DepotS-28-212/28/1889n/aStandard Plan of 1st Class Brick Passenger StationFront and End Elevations, Framing of Baggage Rm Partition
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-2.1889.Brick Psgr 1st Class.Schr.tif
  
DepotS-28-312/28/18897/8/1892Standard Plan of 1st Class Brick Passenger StationDetails of Ticket Office, Bay Window, Doors, Mouldings
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-3.1889.rev1892.Brick Psgr 1st Class.Schr.tif
  
DepotS-28-412/28/1889n/aStandard Plan of 1st Class Brick Passenger StationSections Through Walls, Sliding Door and Window Details
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-4.1889.Brick Psgr 1st Class.Schr.tif
  
DepotS-28-512/28/1889n/aStandard Plan of 1st Class Brick Passenger StationExpress Counter and Decorative Details
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-5.1889.Brick Psgr 1st Class.Schr.tif
  
DepotS-28-612/28/188912/10/1902Standard Plan of 1st Class Brick Passenger Station Bill of MaterialBill of Material
S-28-1, 2, 3, 4, 5, 6 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-6.1889.rev1902.Brick Psgr 1st Class BillMtl.Schr.tif
  
DepotS-28-712/28/18897/8/1892Standard Plan of 1st Class Frame Passenger StationGround Plan
S-28-7, 8, 9, 10, 11 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-7.1889.rev1892.Frame Psgr 1st Class.Schr.tif
  
DepotS-28-812/28/1889n/aStandard Plan of 1st Class Frame Passenger StationFront and End Elevations, Framing of Baggage Rm Partition
S-28-7, 8, 9, 10, 11 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-8.1889.Frame Psgr 1st Class.Schr.tif
  
DepotS-28-912/28/18897/8/1892Standard Plan of 1st Class Frame Passenger StationDetails of Ticket Office, Bay Window, Doors, Mouldings
S-28-7, 8, 9, 10, 11 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-9.1889.rev1892.Frame Psgr 1st Class.Schr.tif
  
DepotS-28-1012/28/18893/25/1892Standard Plan of 1st Class Frame Passenger StationSections Through Walls, Details of Sliding Door, Windows, Mouldings, Finial
S-28-7, 8, 9, 10, 11 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-10.1889.rev1892.Frame Psgr 1st Class.Schr.tif
  
DepotS-28-1112/28/188912/10/1902Standard Plan of 1st Class Frame Passenger Station Bill of MaterialBill of Material
S-28-7, 8, 9, 10, 11 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-11.1889.rev1902.Frame Psgr 1st Class BillMtl.Schr.tif
  
DepotS-28-1212/28/18897/8/1892Standard Plan of 2nd Class Frame Passenger StationGround Plan
S-28-12, 13, 14, 15, 16 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-12.1889.rev1892.Frame Psgr 2nd Class.Schr.tif
  
DepotS-28-1312/28/1889n/aStandard Plan of 2nd Class Frame Passenger StationFront and End Elevations, Framing, Girder over Bay Window
S-28-12, 13, 14, 15, 16 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-13.1889.Frame Psgr 2nd Class.Schr.tif
  
DepotS-28-1412/28/18893/25/1892Standard Plan of 2nd Class Frame Passenger StationSections Through Walls, Details of Door, Mouldings, Finial
S-28-12, 13, 14, 15, 16 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-14.1889.rev1892.Frame Psgr 2nd Class.Schr.tif
  
DepotS-28-1512/28/18897/8/1892Standard Plan of 2nd Class Frame Passenger StationDetails of Ticket Office, Bay Window, Doors, Mouldings
S-28-12, 13, 14, 15, 16 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-15.1889.rev1892.Frame Psgr 2nd Class.Schr.tif
  
DepotS-28-1612/28/188912/10/1902Standard Plan of 2nd Class Frame Passenger Station Bill of MaterialBill of Material
S-28-12, 13, 14, 15, 16 & S-26-19
NPL P Schrenk18x24Chief EngineerS-28-16.1889.rev1902.Frame Psgr 2nd Class BillMtl.Schr.tif
  
DepotS-26-111/14/1900n/aStandard Plan of 1st Class Combination DepotGround Plan, Front Elevation
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPL P Schrenk18x24Chief EngineerS-26-1.1900.1st Class Combo.Schr.tif
  
DepotS-26-211/14/1900n/aStandard Plan of 1st Class Combination DepotRoof Plan, End Elevation, Sections
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPL P Schrenk18x24Chief EngineerS-26-2.1900.1st Class Combo.Schr.tif
  
DepotS-26-311/14/1900n/aStandard Plan of 1st Class Combination DepotJoist Foundation Plan, Front Elevation, Sections
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPL P Schrenk18x24Chief EngineerS-26-3.1900.1st Class Combo.Schr.tif
  
DepotS-26-411/14/19005/1/1904Standard Plan of 1st Class Combination Depot Bill of MaterialBill of Material
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPL P Schrenk18x24Chief EngineerS-26-4.1900.rev1904.1st Class Combo BillMtl.Schr.tif
  
DepotS-26-511/14/1900n/aStandard Plan of 2nd Class Combination DepotGround Plan, Front Elevation
S-26- 5, 6, 7, 8, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-5.1900.2nd Class Combo.Schr.tif
  
DepotS-26-611/14/1900n/aStandard Plan of 2nd Class Combination DepotRoof Plan, End Elevation, Sections
S-26- 5, 6, 7, 8, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-6.1900.2nd Class Combo.Schr.tif
  
DepotS-26-711/14/1900n/aStandard Plan of 2nd Class Combination DepotJoist Foundation Plan, Front Elevation, Sections
S-26- 5, 6, 7, 8, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-7.1900.2nd Class Combo.Schr.tif
  
DepotS-26-811/14/19005/1/1904Standard Plan of Second Class Combination Depot Bill of MaterialBill of Material
not shown
NPL P Schrenk18x24Chief EngineerS-26-8.1900.rev1904.2nd Class Combo BillMtl.Schr.tif
  
DepotS-26-911/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Ground Plan, Second Floor Plan, Front Elevation
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-9.1900.2nd Class Combo 2Story.Schr.tif
  
DepotS-26-1011/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot End Elevations, Sections
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-10.1900.2nd Class Combo 2Story.Schr.tif
  
DepotS-26-1111/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Framing, Joist and Foundation Plans
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-11.1900.2nd Class Combo 2Story.Schr.tif
  
DepotS-26-1211/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Roof Plan, Wall Sections, Stair and Gable Window Details
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-12.1900.2nd Class Combo 2Story.Schr.tif
  
DepotS-26-1311/14/19005/1/1905Standard Plan of Second Class 2-Story Combination Depot Bill of MaterialBill of Material
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34
NPL P Schrenk18x24Chief EngineerS-26-13.1900.rev1905.2nd Class Combo 2Story BillMtl.Schr.tif
  
DepotS-26-1411/14/19001/13/1902Standard Plan of 3rd Class Combination DepotGround Plan, Front Elevation
S-26-14, 15, 16, 17, 30, 31, 32, 33, & 34
NPL P Schrenk18x24Chief EngineerS-26-14.1900.rev1902.3rd Class Combo.Schr.tif
  
DepotS-26-1511/14/1900n/aStandard Plan of 3rd Class Combination DepotRoof Plan, End Elevation, Sections
S-26-14, 15, 16, 17, 30, 31, 32, 33, & 34
NPL P Schrenk18x24Chief EngineerS-26-15.1900.3rd Class Combo.Schr.tif
  
DepotS-26-1611/14/1900n/aStandard Plan of 3rd Class Combination DepotJoist and Foundation Plan, Front Elevation, Section
S-26-14, 15, 16, 17, 30, 31, 32, 33, & 34
NPL P Schrenk18x24Chief EngineerS-26-16.1900.3rd Class Combo.Schr.tif
  
DepotS-26-1711/14/19005/1/1904Standard Plan of 3rd Class Combination Depot Bill of MaterialBill of Material
S-26-14, 15, 16, 17, 30, 31, 32, 33, & 34
NPL P Schrenk18x24Chief EngineerS-26-17.1900.rev1904.3rd Class Combo BillMtl.Schr.tif
  
DepotS-26-1811/14/19001/13/1902Standard Plan of 3rd Class 2-Story Combination Depot Ground Plan, Second Floor Plan, Front Elevation
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34
NPL P Schrenk18x24Chief EngineerS-26-18.1900.rev1902.3rd Class Combo 2Story.Schr.tif
  
DepotS-26-1911/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot End Elevations, Sections
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34
NPL P Schrenk18x24Chief EngineerS-26-19.1900.3rd Class Combo 2Story.Schr.tif
  
DepotS-26-2011/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot Framing, Joist and Foundation Plans
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34
NPL P Schrenk18x24Chief EngineerS-26-20.1900.3rd Class Combo 2Story.Schr.tif
  
DepotS-26-2111/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot Roof and Framing Plans, Details for Stairs, Trim
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34
NPL P Schrenk18x24Chief EngineerS-26-21.1900.3rd Class Combo 2Story.Schr.tif
  
DepotS-26-2211/14/19005/1/1904Standard Plan of 3rd Class 2-Story Combination Depot Bill of MaterialBill of Material
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34
NPL P Schrenk18x24Chief EngineerS-26-22.1900.rev1904.3rd Class Combo 2Story  BillMtl.Schr.tif
  
DepotS-26-231/1/19001/13/1902Standard Plan of 4th Class Combination DepotGround Plan, Elevations, Framing, Sections
S-26-23, 24, 25 & 32
NPL P Schrenk18x24Chief EngineerS-26-23.1900.rev1902.4th Class Combo.Schr.tif
  
DepotS-26-23A10/7/19005/1/1904Plan of Special 4th Class Combination DepotFront Elevation, Ground Plan, Bill of Material to be added to Standard Plan S-26-25
S-26-23, 23A, 24, 25 & 32
NPL P Schrenk18x24Chief EngineerS-26-23A.1900.rev1904.Special 4th Class Combo.Schr.tif
  
DepotS-26-241/1/19005/1/1902Standard Plan of 4th Class Combination DepotRoof Plan, Foundation Plan, Slat Partition, Bay Window Details, Moulding Detail
S-26-23, 24, 25 & 32
NPL P Schrenk18x24Chief EngineerS-26-24.1900.rev1902.4th Class Combo.Schr.tif
  
DepotS-26-251/1/19005/1/1904Standard Plan of 4th Class Combination Depot Bill of MaterialBill of Material
S-26-23, 24, 25 & 32
NPL P Schrenk18x24Chief EngineerS-26-25.1900.rev1904.4th Class Combo BillMtl.Schr.tif
  
DepotS-26-3011/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Ticket Window and Shelf, Sections through Walls, Bay Window, Eave Bracket
S-26-1, 2, 3, 4, 30, 31, 32, & 34 (1st Class) S-26- 5, 6, 7, 8, 30, 31, 32 & 34 (2nd Class) S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34 (2nd Cl 2-St) S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPL P Schrenk18x24Chief EngineerS-26-30.1900.Combo Details.Schr.tif
  
DepotS-26-3111/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Dormer, Freight Rm Door, Wire Gate, Ironwork
S-26-1, 2, 3, 4, 30, 31, 32, & 34 (1st Class) S-26- 5, 6, 7, 8, 30, 31, 32 & 34 (2nd Class) S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34 (2nd Cl 2-St) S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPL P Schrenk18x24Chief EngineerS-26-31.1900.Combo Details.Schr.tif
  
DepotS-26-3211/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Finials, Mouldings, Brackets, Hinges
S-26-1, 2, 3, 4, 30, 31, 32, & 34 (1st Class)
S-26- 5, 6, 7, 8, 30, 31, 32 & 34 (2nd Class) S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34 (2nd Cl 2-St) S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPL P Schrenk18x24Chief EngineerS-26-32.1900.Combo Depot Details.Schr.tif
  
DepotS-26-3311/14/19005/1/1902Standard Plan of 3rd Class Combination Depot DetailsDetails of Slat Partition
S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPL P Schrenk18x24Chief EngineerS-26-33.1900.rev1902.3rd Class Combo Details.Schr.tif
  
DepotS-26-348/12/1901n/aStandard Plan of Operators Table for DepotsSpecifications, Plan and Section Viewsof Operator Table
S-26-1, 2, 3, 4, 30, 31, 32, & 34 (1st Class) S-26- 5, 6, 7, 8, 30, 31, 32 & 34 (2nd Class) S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34 (2nd Cl 2-St) S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class) S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPL P Schrenk18x24Chief EngineerS-26-34.1901.Operators Table.Schr.tif
  
DepotS-27-112/28/18897/8/1892Standard Plan of 1st Class Freight DepotGround Plan,  Elevation, Uncovered Front View
S-27-1, 2, 3, 4, 5 & 9 (1 Story Off.) S-27-1, 2, 3, 6, 7, 8 & 9 (2 Story Off.)
NPL P Schrenk18x24Chief EngineerS-27-1.1889.rev1892.1st Class Freight Depot.Schr.tif
  
DepotS-27-212/28/18897/8/1892Standard Plan of 1st Class Freight DepotCross Sections, Wrought Iron Plates, Castings for Roof Truss
S-27-1, 2, 3, 4, 5 & 9 (1 Story Off.) S-27-1, 2, 3, 6, 7, 8 & 9 (2 Story Off.)
NPL P Schrenk18x24Chief EngineerS-27-2.1889.rev1891.1st Class Freight Depot.Schr.tif
  
DepotS-27-312/28/1889n/aStandard Plan of Roof Truss  for 1st Class Freight DepotCross Sections and Details for Roof Trusses.
S-27-1, 2, 3, 4, 5 & 9 (1 Story Off.) S-27-1, 2, 3, 6, 7, 8 & 9 (2 Story Off.)
NPL P Schrenk18x24Chief EngineerS-27-3.1889.1st Class Freight Depot Roof Truss.Schr.tif
  
DepotS-27-412/28/18897/8/1892Standard Plan of 1 Story Office for 1st Class Freight DepotFloor Plan, Section A-B
S-27-1, 2, 3, 4, 5 & 9
NPL P Schrenk18x24Chief EngineerS-27-4.1889.rev1892.1st Class Freight Depot 1-Story Office.Schr.tif
  
DepotS-27-512/28/1889n/aStandard Plan of 1 Story Office for 1st Class Freight DepotEnd Elevation, Side Elevation, Framing of Partition
S-27-1, 2, 3, 4, 5 & 9
NPL P Schrenk18x24Chief EngineerS-27-5.1889.1st Class Freight Depot 1-Story Office.Schr.tif
  
DepotS-27-612/28/18897/8/1892Standard Plan of 2 Story Office for 1st Class Freight Depot1st  Floor Plan, 2nd Floor Plan,  Cross Section of Vault
S-27-1, 2, 3, 6, 7, 8 & 9
NPL P Schrenk18x24Chief EngineerS-27-6.1889.rev1892.1st Class Freight Depot 2-Office.Schr.tif
  
DepotS-27-712/28/1889n/aStandard Plan of 2 Story Office for 1st Class Freight DepotElevation, Cross Section, Detail of Cornice
S-27-1, 2, 3, 6, 7, 8 & 9
NPL P Schrenk18x24Chief EngineerS-27-7.1889.1st Class Freight Depot 2-Office.Schr.tif
  
DepotS-27-812/28/1889n/aStandard Plan of 2 Story Office for 1st Class Freight DepotDetails for  Counter,  Door and Window Casings,  Stairs, Wainscotting
S-27-1, 2, 3, 6, 7, 8 & 9
NPL P Schrenk18x24Chief EngineerS-27-8.1889.1st Class Freight Depot 2-Office.Schr.tif
  
DepotS-27-912/28/1889n/aStandard Plan of 1st Class Freight Depot, Foundation for        4 Ton ScaleCross Section and Plan Views
S-27-1, 2, 3, 4, 5 & 9 (1 Story Off.) S-27-1, 2, 3, 6, 7, 8 & 9 (2 Story Off.)
NPL P Schrenk18x24Chief EngineerS-27-9.1889.1st Class Freight Depot Scale Foundation.Schr.tif
  
DepotS-27-2012/28/18897/8/1892Standard Plan of 2nd Class Freight Depot Plan View, Side Elevation Showing Framing, End Elevation Showing Framing of Partition.
S-27-20, 21, 22, 23
NPL P Schrenk18x24Chief EngineerS-27-20.1889.rev1892.2nd Class Freight Depot.Schr.tif
  
DepotS-27-2112/28/18894/9/1891Standard Plan of 2nd Class Freight Depot Elevations: Track Side, Delivery Side, Office End, Office End Framing
S-27-20, 21, 22, 23
NPL P Schrenk18x24Chief EngineerS-27-21.1889.rev1891.2nd Class Freight Depot.Schr.tif
  
DepotS-27-2212/28/1889n/aStandard Plan of 2nd Class Freight Depot Details for  Counter,  Baggage Door, Eave Brackets, Section through Wall
S-27-20, 21, 22, 23
NPL P Schrenk18x24Chief EngineerS-27-22.1889.2nd Class Freight Depot.Schr.tif
  
DepotS-27-2312/28/188912/10/1902Standard Plan of 2nd Class Freight Depot - Bill of MaterialBill of Material
not listed
NPL P Schrenk18x24Chief EngineerS-27-23.1889.rev1902.2nd Class Freight Depot BillMtl.Schr.tif
  
IceS-27-4012/28/188912/20/1890Standard Plan of Ice House ElevatorPlan View, Elevations, Ventilator, Hardware
S-27-40 & 44 (400 Ton)
S-27-40 & 46 (600 Ton)
S-27-40, 50 & 51 (1000 Ton)
NPL P Schrenk18x24Chief EngineerS-27-40.1889.rev1890.Ice House Elevator.Schr.tif
  
IceS-27-4112/28/188912/10/1902Standard Plan of 100 Ton Ice HousePlan View, Elevations, Framing, Sections, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-27-41.1889.rev1902.100-ton Ice House.Schr.tif
  
IceS-27-41A10/21/19023/8/1904Standard Plan of 50 Ton Ice HousePlan View, Elevations, Framing, Sections, Bill of Material
No other plans
NPL P Schrenk18x24Chief EngineerS-27-41A.1902.rev1904.50-ton Ice House.Schr.tif
  
IceS-27-4212/28/188912/10/1902Standard Plan of 200 Ton Ice HousePlan View, Elevations, Ventilator, Hardware
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-27-42.1889.rev1902.200-ton Ice House.Schr.tif
  
IceS-27-4412/28/188912/10/1902Standard Plan of 400 Ton Ice HousePlan View, Elevations, Framing, Sections, Bill of Material
S-27-40 & 44
NPL P Schrenk18x24Chief EngineerS-27-44.1889.rev1902.400-ton Ice House.Schr.tif
  
IceS-27-4612/28/188912/10/1902Standard Plan of 600 Ton Ice HousePlan View, Elevations, Framing, Sections, Bill of Material
S-27-40 & 46
NPL P Schrenk18x24Chief EngineerS-27-46.1889.rev1902.600-ton Ice House.Schr.tif
  
IceS-27-5012/28/188910/10/1891Standard Plan of 1000 Ton Ice HousePlan View, Elevations
S-27-40, 50 & 51
NPL P Schrenk18x24Chief EngineerS-27-50.1889.rev1891.1000-ton Ice House.Schr.tif
  
IceS-27-5010/21/1904n/aStandard Plan of Ice House -1000 ton CapacityPlan View, Elevations, Cross Section
none - possibly trimmed off
NPL P Schrenk18x24Chief EngineerS-27-50.1904.1000-ton Ice House.Schr.tif
  
IceS-27-502/9/190512/11/1908Standard Plan of Ice HousesGround Plan and Elevation for 2900 ton ice house, Sketches Showing Dimensions for 2200-ton, 1400-ton, 1100-ton and 850-ton Ice Houses
S-27-50, 51 & 52
NPL P Schrenk18x24Chief EngineerS-27-50.1905.rev1908.Ice Houses.Schr.tif
  
IceS-27-5112/28/188912/10/1902Standard Plan of 1000 Ton Ice HouseEnd  Elevation, Section, Bill of Material
S-27-40, 50 & 51
NPL P Schrenk18x24Chief EngineerS-27-51.1889.rev1902.1000-ton Ice House.Schr.tif
  
Storaage ShedS-27-6012/28/188912/10/1902Standard Plan of Storage Shed, 24 x 60Ground Plan, Elevations, Framing Plans, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-27-60.1889.rev1902.Storage Shed.Schr.tif
  
Section HouseS-29-112/28/18897/8/1892Standard Plan of 16 Room Boarding HouseGround Plan, Second Floor Plan, Foundation Plan
S-29-1, 2, 3 & 4
NPL P Schrenk18x24Chief EngineerS-29-1.1889.rev1892.16-rm Boarding House.Schr.tif
  
Section HouseS-29-212/28/1889n/aStandard Plan of 16 Room Boarding HouseElevations and Sections
S-29-1, 2, 3 & 4
NPL P Schrenk18x24Chief EngineerS-29-2.1889.16-rm Boarding House.Schr.tif
  
Section HouseS-29-312/28/1889n/aStandard Plan of 16 Room Boarding HouseStair Details, Wall Sections, Mouldings
S-29-1, 2, 3 & 4
NPL P Schrenk18x24Chief EngineerS-29-3.1889.16-rm Boarding House.Schr.tif
  
Section HouseS-29-4probably 12/28/1889n/aStandard Plan of 16 Room Boarding House Bill of MaterialBill of Material
S-29-1, 2, 3 & 4
NPL P Schrenk18x24Chief EngineerS-29-4.1889.16-rm Boarding House.Schr.tif
  
StockS-31-17/11/18904/11/1905Standard Plan of Stock Yard - Capacity 5 carsPlan View, Bill of Materials
S-31-1, 7, 8 & 9
NPL P Schrenk18x24Chief EngineerS-31-1.1890.rev1905.5-car Stock Yard.Schr.tif
  
StockS-31-27/11/18904/11/1905Standard Plan of Stock Yard - Capacity 10 carsPlan View, Bill of Materials
S-31-2 ,7, 8, 9 & 11
NPL P Schrenk18x24Chief EngineerS-31-2.1890.rev1905.10-car Stock Yard.Schr.tif
  
StockS-31-37/11/18904/11/1905Standard Plan of Stock Yard - Capacity 15 carsPlan View, Bill of Materials
S-31-3, 7, 8, 9 & 11
NPL P Schrenk18x24Chief EngineerS-31-3.1890.rev1905.15-car Stock Yard.Schr.tif
  
StockS-31-47/11/18904/11/1905Standard Plan of Stock Yard - Capacity 20 carsPlan View, Bill of Materials
S-31-4, 7, 8, 9 & 11
NPL P Schrenk18x24Chief EngineerS-31-4.1890.rev1905.20-car Stock Yard.Schr.tif
  
StockS-31-57/11/18904/11/1905Standard Plan of Stock Yard - Capacity 50 carsPlan View, Bill of Materials
S-31-5, 7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-31-5.1890.rev1905.50-car Stock Yard.Schr.tif
  
StockS-31-67/11/18904/11/1905Standard Plan of Stock Yard - Capacity 100 carsPlan View, Bill of Materials
S-31-6, 7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-31-6.1890.rev1905.100-car Stock Yard.Schr.tif
  
StockS-31-72/21/18914/11/1905Standard Plan of Stock Yard - Detail of ChutesGeneral Plan View, Elevation, Sections
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
NPL P Schrenk18x24Chief EngineerS-31-7.1891.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-87/11/18904/11/1905Standard Plan of Stock Yard - DetailsGates, Hay and Water Troughs, Hay Shutters
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
S-31-8, 9, 12, 13 & 14 (50 cars yard for loading range cattle)
NPL P Schrenk18x24Chief EngineerS-31-8.1890.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-97/11/18904/11/1905Standard Plan of Stock Yard - Details of iron workIron Work
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
S-31-8, 9, 12, 13 & 14 (50 cars yard for loading range cattle)
NPL P Schrenk18x24Chief EngineerS-31-9.1890.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-107/11/18904/11/1905Standard Plan of Stock Yard - DetailsGeneral Plan View, Elevation, Sections for Hay Barn and Shelter Shed
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
NPL P Schrenk18x24Chief EngineerS-31-10.1890.rev1905.Stock Yard Details.Schre.tif
  
StockS-31-117/11/18904/11/1905Standard Plan of Stock Yard - DetailsDetails of Single Stock Chute, Shelter Shed, Bill of Materials
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
NPL P Schrenk18x24Chief EngineerS-31-11.1890.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-122/16/18914/11/1905Standard Plan of Stock Yard For Loading of Range Cattle - Capacity 50 carsPlan View, Bill of Materials
S-31-8, 9, 12, 13 & 14
NPL P Schrenk18x24Chief EngineerS-31-12.1891.rev1905.50-car Stock Yard.Schr.tif
  
StockS-31-132/16/18914/11/1905Standard Plan of Stock Yard For Loading of Range Cattle - DetailsGeneral Plan View and Sections for Chute and Gate
S-31-8, 9, 12, 13 & 14
NPL P Schrenk18x24Chief EngineerS-31-13.1891.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-142/16/18914/11/1905Standard Plan of Stock Yard For Loading of Range Cattle - Detail of SqueezerGeneral Plan, Sections, and Iron Hinge for Squeezer
S-31-8, 9, 12, 13 & 14
NPL P Schrenk18x24Chief EngineerS-31-14.1891.rev1905.Stock Yard Details.Schr.tif
  
StockS-31-157/13/18964/11/1905Standard Plan of Double Deck Stock ChuteGround Plan, Elevations, Sections, Gates, Hardware, Bill of Materials
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-31-15.1896.rev1905.Dbl Deck Stock Chute.Schr.tif
  
WaterS-37-112/28/1889n/aStandard Plan of Pump HouseGround Plan, Elevations, Sections, Hinge Details
not listed
NPL P Schrenk18x24Chief EngineerS-37-1.1889.Pump House.Schr.tif
  
WaterS-37-14/10/18915/29/1897Standard Plan of Pump HouseGround Plan, Elevations, Sections
S-37-1 & 2
NPL P Schrenk18x24Chief EngineerS-37-1.1891.rev1897.Pump House.Schr.tif
  
WaterS-37-18/10/19037/7/1905Standard Plan of Gasoline Engine Pump HouseGround Plan, Elevations, Sections, Details, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-37-1.1903.rev1905.Gasoline Engine Pump House.Schr.tif
  
WaterS-37-1 Dup8/10/19037/7/1905Standard Plan of Gasoline Engine Pump HouseDuplicate of NP-StdPl_0129
Complete - 1 sheet
NPL P Schrenk18x24Chief Engineernone - duplicate
  
WaterS-37-16/1/1900n/aStandard Plan of Gasoline Engine Pump HouseGround Plan, Elevations, Sections, Details, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-37-1.1900.Gasoline Engine Pump House.Schr.tif
  
WaterS-37-24/10/18915/29/1897Standard Plan of Pump House Bill of MaterialBill of Material
S-37-1 & 2
NPL P Schrenk18x24Chief EngineerS-37-2.1891.1897.Pump House BillMtl.Schr.tif
  
WaterS-37-212/1/19021/22/1906Standard Plan of Pump HouseGround Plan, Elevations, Sections, Details, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-37-2.1902.rev1906.Pump House.Schr.tif
  
WaterS-37-212/7/1898n/aStandard Plan of Pump HouseGround Plan, Elevations, Sections, Details, Bill of Material
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-37-2.1898.Pump House.Schr.tif
  
WaterS-37-212/28/1889n/aStandard Plan of Pump House Bill of MaterialBill of Material
not listed
NPL P Schrenk18x24Chief EngineerS-37-2.1889.Pump House BillMtl.Schr.tif
  
WaterS-37-311/13/19005/26/1905Standard Plan of Water Tank 48000 Gall CapacityElevations, Sections, Details
S-37-3, 4, 5 & 6
NPL P Schrenk18x24Chief EngineerS-37-3.1900.rev1905.48K-gal Water Tank.Schr.tif
  
WaterS-37-411/13/19005/26/1905Standard Plan of Water Tank 48000 Gall CapacityGround Plan of Foundation and Frost Chamber
S-37-3, 4, 5 & 6
NPL P Schrenk18x24Chief EngineerS-37-4.1900.rev1905.48K-gal Water Tank.Schr.tif
  
WaterS-37-611/13/19005/26/1905Standard Plan of 48000 Gallons Water Tank Bill of Materail and DetailsBill of Material and Details of Cast Iron Parts
S-37-3, 4, 5 & 6
NPL P Schrenk18x24Chief EngineerS-37-6.1900.rev1905.48K-gal Water Tank BillMtl.Schr.tif
  
WaterS-37-712/3/1895n/aStandard Plan of Submerged Water StationGround Plan, Longitudinal Section, Bill of Material
S-37-7 & 8
NPL P Schrenk18x24Chief EngineerS-37-7.1895.Submerged Water Station.Schr.tif
  
WaterS-37-71/17/189611/16/1897Standard Plan of Submerged Water Station As Manufactured by Fairbanks Morse & Co. St. PaulGround Plan, Sections
not listed
NPL P Schrenk18x24Chief EngineerS-37-7.1896.rev1897.FM Submerged Water Station.Schr.tif
  
WaterS-37-78/1/1898n/aStandard Plan of Submerged Water Station As Manufactured by Fairbanks Morse & Co. St. PaulGround Plan, Sections
S-37-7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-37-7.1898.FM Submerged Water Station.Schr.tif
  
WaterS-37-7A11/14/1895n/aStandard Plan of Submerged Water StationGround Plan, Sections
S-37-7 & 8
NPL P Schrenk18x24Chief EngineerS-37-7A.1895.Submerged Water Station.Schr.tif
  
WaterS-37-812/3/1895n/aStandard Plan of Submerged Water Station DetailsDetails of Tank, Float, Swing Joint
S-37-7 & 8
NPL P Schrenk18x24Chief EngineerzS-37-8.1895.Submerged Water Station Details.Schr.tif
  
WaterS-37-81/17/189611/16/1897Standard Plan of Submerged Water Station As Manufactured by Fairbanks Morse & Co. St. Paul - Details
not listed
NPL P Schrenk18x24Chief EngineerS-37-8.1896.rev1897.FM Submerged Water Station Details.Schr.tif
  
WaterS-37-88/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsHardware Details
S-37-7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-37-8.1898.FM Submerged Water Station Details.Schr.tif
  
WaterS-37-8A11/14/1895n/aStandard Plan of Submerged Water StationDetail of Flexible Joint for Steam Stand Pipe
S-37-7 & 8
NPL P Schrenk18x24Chief EngineerS-37-8A.1895.Submerged Water Station.Schr.tif
  
WaterS-37-98/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsHardware Details for Tank, Tank Lug, Float,  Relief Valve, Various Fittings
S-37-7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-37-9.1898.FM Submerged Water Station Details.Schr.tif
  
WaterS-37-108/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsBill of Material and Details
S-37-7, 8, 9 & 10
NPL P Schrenk18x24Chief EngineerS-37-10.1898.FM Submerged Water Station Details.Schr.tif
  
Section HouseS-39-412/28/18897/8/1892Standard Plan of 2nd Class Section House1st and 2nd Floor Plans, End and Side Elevations,  Section A-B
S-39-4 & 5
NPL P Schrenk18x24Chief EngineerS-39-4.1889.rev1892.2nd Class Section House.Schr.tif
  
Section HouseS-39-512/28/188912/10/1902Standard Plan of 2nd Class Section House - Bill of MaterialBill of Material
S-39-4 & 5
NPL P Schrenk18x24Chief EngineerS-39-5.1889.rev1902.2nd Class Section House BillMtl.Schr.tif
  
Section HouseS-39-612/28/18897/8/1892Standard Plan of 3rd Class Section House1st and 2nd Floor Plans, End and Side Elevations,  Section A-B
S-39-6 & 7
NPL P Schrenk18x24Chief EngineerS-39-6.1889.rev1892.3rd Class Section House.Schr.tif
  
Section HouseS-39-712/28/188912/10/1902Standard Plan of 3rd Class Section House - Bill of MaterialBill of Material
S-39-6 & 7
NPL P Schrenk18x24Chief EngineerS-39-7.1889.rev1902.3rd Class Section House BillMtl.Schr.tif
  
Section HouseS-39-503/8/1903n/aStandard Plan of Section HouseFront and Side Elevations, Section
S-39-50 & 51
NPL P Schrenk18x24Chief EngineerS-39-50.1903.Section House.Schr.tif
  
Section HouseS-39-513/8/19033/8/1904Standard Plan of Section House - Floor Plans,Bill of MaterialsFloor Plans, Details, Bill of Material
S-39-50 & 51
NPL P Schrenk18x24Chief EngineerS-39-51.1903.rev1904.Section House Details.Schr.tif
  
Section HouseS-39-604/7/19042/10/1905Standard Plan of Section House - Two StoryElevations, Sections, Details
S-39-60 & 61
NPL P Schrenk18x24Chief EngineerS-39-60.1904.rev1905.Section House Two Story.Schr.tif
  
Section HouseS-39-614/7/19042/10/1905Standard Plan of Section House - Two StoryFloor Plans, Bill of Materials
S-39-60 & 61
NPL P Schrenk18x24Chief EngineerS-39-61.1904.rev1905.Section House Two Story.Schr.tif
  
Section HouseS-39-625/2/1906n/aSpecial Plan of Section House - 1 1/2 StoryFloor Plans, Elevations, Sections
not listed
NPL P Schrenk18x24Chief EngineerS-39-62.1906.Section House 1.5 Story.Schr.tif
  
Section HouseS-39-635/2/1906n/aSpecial Plan of Section House - 1 1/2 StoryBill of Material
not listed
NPL P Schrenk18x24Chief EngineerS-39-63.1906.Section House 1.5 Story BillMtl.Schr.tif
  
Section HouseS-39-758/24/19033/8/1904Standard Plan of Bunk House
not listed
NPL P Schrenk18x24Chief EngineerS-39-75.1903.rev1904.BunkHouse.Schr.tif
  
Section HouseS-39-804/7/1904n/aStandard Plan of Bunk HouseFloor Plansfor 12 and 24 Men, Elevation, Section
Complete - 1 sheet
NPL P Schrenk18x24Chief EngineerS-39-80.1904.BunkHouse.Schr.tif
  
CoalS-36-273/1/1899n/aStandard Plan of Double Pocket Coal ChuteGround Plan
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPL P Schrenk18x24Chief EngineerS-36-27.1899.Dbl Pocket Coal Chute.Schr.tif
  
CoalS-36-283/1/18994/27/1903Standard Plan of Double Pocket Coal ChuteLongitudinal Section
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPL P Schrenk18x24Chief EngineerS-36-28.1899.rev1903.Dbl Pocket Coal Chute.Schr.tif
  
CoalS-36-293/1/18999/4/1903Standard Plan of Double Pocket Coal ChuteSection, Elevation at Hopper End
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPL P Schrenk18x24Chief EngineerS-36-29.1899.rev1903.Dbl Pocket Coal Chute.Schr.tif
  
CoalS-36-303/1/18995/28/1902Standard Plan of Double Pocket Coal ChuteGeneral Plan, Sections, End Bent, Top View Over Hopper
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPL P Schrenk18x24Chief EngineerS-36-30.1899.rev1902.Dbl Pocket Coal Chute.Schr.tif
  
CoalS-36-1016/24/1904n/aStandard Plan of Coal Chute for Pockets of 70 tons Capacity EachRear Elevation, Engine House, Sectional Plan of End Chute
S-36-100, 101, 102, 103, 104 & 105
NPL P Schrenk18x24Chief EngineerS-36-101.1904.Coal Chute 70-ton.Schr.tif
  
CoalS-36-1026/24/1904n/aStandard Plan of Coal Chute for Pockets of 70 tons Capacity EachGround Plan of Engine House, Storage Bin & Hopper
S-36-100, 101, 102, 103, 104 & 105
NPL P Schrenk18x24Chief EngineerS-36-102.1904.Coal Chute 70-ton.Schr.tif
  
CoalS-36-1036/24/1904n/aStandard Plan of Coal Chute for Pockets of 70 tons Capacity EachEnd Elevation,Section Through Bottom Trough
S-36-100, 101, 102, 103, 104 & 105
NPL P Schrenk18x24Chief EngineerS-36-103.1904.Coal Chute 70-ton.Schr.tif
  
CoalS-36-1203/25/19058/21/1905Standard Plan of Coal Chute with one 70 ton Pocket on Scale Ground Plans, Elevations, Sections
not listed
NPL P Schrenk18x24Chief EngineerS-36-120.1905.rev1905.Coal Chute 70-ton.Schr.tif
  
CoalS-36-1213/25/19058/21/1905Standard Plan of Coal Chute with one 70 ton Pocket on Scale - Detail of PocketFront Elevation, Section, Half Ground Plan and Half Horizontal Section
not listed
NPL P Schrenk18x24Chief EngineerS-36-121.1905.rev1905.Coal Chute 70-ton Detail.Schr.tif
  
CoalS-36-1223/25/19058/21/1905Standard Plan of Coal Chute with one 70 ton Pocket on Scale Front and End Elevations, Section, Plan of Vertical Chute
not listed
NPL P Schrenk18x24Chief EngineerS-36-122.1905.rev1905.Coal Chute 70-ton.Schr.tif
  
CoalS-36-1233/25/19058/21/1905Standard Plan of Coal Chute with one 70 ton Pocket on Scale DetailsDetails for Pocket and Trough Lining, Trough and Hopper Sections
not listed
NPL P Schrenk18x24Chief EngineerS-36-123.1905.rev1905.Coal Chute 70-ton Details.Schr.tif
  
CoalS-36-1243/25/19058/21/1905Standard Plan of Coal Chute with one 70 ton Pocket on Scale DetailsDetails of Bucket, Trough Lining, Protectors
not listed
NPL P Schrenk18x24Chief EngineerS-36-124.1905.rev1905.Coal Chute 70-ton Details.Schr.tif
  
CoalS-36-1258/21/1905n/aStandard Plan of Coal Chute with one 70 ton Pocket on Scale DetailsDetail Showing Undercut Gate and Shute and Applied to Pocket
not listed
NPL P Schrenk18x24Chief EngineerS-36-125.1905.Coal Chute 70-ton Details.Schr.tif
  
RoundhouseS-32-112/28/1889n/aStandard Plan of 1st Class RoundhouseGround Plan
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-1.1889.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-13/1/1899n/aStandard Plan of 1st Class RoundhouseGround Plan
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-1.1899.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-212/28/1889n/aStandard Plan of 1st Class RoundhouseFront, Rear and Side Elevations
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-2.1889.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-23/1/1899n/aStandard Plan of 1st Class RoundhouseSection, Firewall End Elevation
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-2.1899.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-312/28/188912/21/1895Standard Plan of 1st Class RoundhouseSection, Roof Plan
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-3.1889.rev1895.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-33/1/1899n/aStandard Plan of 1st Class RoundhouseFront, Rear and Permanent End Wall Elevations
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-3.1899.1st Class Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-412/28/1889n/aStandard Plan of 1st Class RoundhousePile Foundation and Centering for Door Arches
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-4.1889.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-43/1/1899n/aStandard Plan of 1st Class RoundhouseGeneral Plan, Roof Plan, Section of Walls
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-4.1899.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-512/28/18898/25/1892Standard Plan of 2nd Class RoundhouseGround Plan
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-5.1889.rev1892.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-56/10/1897n/aStandard Plan of 2nd Class RoundhouseGround Plan replacing Plan of 1895
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-5.1897.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-53/1/1899n/aStandard Plan of 1st Class RoundhousePile Foundation and Centering for Door Arches
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-5.1899.1st Class Roundhouse.Schr.tif
  
RoundhouseS-32-612/28/1889n/aStandard Plan of 2nd Class RoundhouseFront, Rear and Side Elevations
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-6.1889.2nd Class Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-63/1/1899n/aStandard Plan of 1st Class Roundhouse Large DoorElevation and Cross Section
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-6-1899.1st Class Roundhouse Lg Door.Schr.tif
  
RoundhouseS-32-712/28/188912/21/1895Standard Plan of 2nd Class RoundhouseSection, Roof Plan
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-7.1889.rev1895.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-76/10/1897n/aStandard Plan of 2nd Class RoundhouseSection, Roof Plan replacing Plan of 1895
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-7.1897.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-73/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Doors and Windows
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-7.1899.1st Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-812/28/18899/10/1890Standard Plan of Details for Roundhouses - Large DoorElevation and Section for Large Door
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-8.1889.rev1890.Roundhouse Details Lg Door.Schr.tif
  
RoundhouseS-32-83/1/1899n/aStandard Plan of 1st Class Roundhouse Cut StoneSpecification for Cut Stone Details
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-8.1899.1st Class Roundhouse Cut Stone.Schr.tif
  
RoundhouseS-32-912/28/1889n/aStandard Plan of Details for Roundhouses - Doors and WindowsElevations and Sections for Doors and Windows
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-9.1889.Roundhouse Details.Schr.tif
  
RoundhouseS-32-93/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Large Door and Assoc Hardware
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-9.1899.1st Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-1012/28/1889n/aStandard Plan of Details for Roundhouses - Door FastenersDetails of Hardware for Door Fasteners
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-10.1889.Roundhouse Details.Schr.tif
  
RoundhouseS-32-103/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Spring Locks, Rail Anchors, Hinges
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-10.1899.1st Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-1112/28/1889n/aStandard Plan of Details for Roundhouses - Ironwork for DoorsDetails of Ironwork for Doors
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-11.1889.Roundhouse Details.Schr.tif
  
RoundhouseS-32-113/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Latch, Fire Door, Cast Iron Grates, Hinge Castings
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-11.1899.1st Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-1212/28/1889n/aStandard Plan of Details for Roundhouses Iron WorkDetails of Ironwork
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-12.1889.Roundhouse Details.Schr.tif
  
RoundhouseS-32-123/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Truck Stops for 56 and 66 lbs. Rails
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-12.1899.1st Class Roundhouse Details Truck Stops.Schr.tif
  
RoundhouseS-32-1312/28/1889tornStandard Plan of Details for Roundhouses - Ironwork Details of Ironwork
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-13.1889.Roundhouse Details.Schr.tif
  
RoundhouseS-32-133/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Smokejack, Damper
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-13.1899.1st Roundhouse Details Smokejack.Schr.tif
  
RoundhouseS-32-146/10/18979/5/1898Standard Plan of Details for Roundhouses - Drop Hood Smoke JackDetails of Smokejack, Damper
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-14.1897.rev1898.Roundhouse Details Smokejack.Schr.tif
  
RoundhouseS-32-143/1/1899n/aStandard Plan of 1st Class Roundhouse Tool Closet and Vice BenchPlan Views, Sections and Bill of Materials for Tool Closet and Vice Bench
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-14.1899.1st Class Roundhouse Details Tool Closet.Schr.tif
  
RoundhouseS-32-1512/28/1889n/aStandard Plan of Ash PitPlan View, Sections, Bill of Material
Complete 1 Sheet
NPL P Schrenk18x24Chief EngineerS-32-15.1889.Ash Pit.Schr.tif
  
RoundhouseS-32-154/7/1899n/aStandard Plan of 1st Class Roundhouse Bill of MaterialBill of Material
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-15.1899.1st Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-1612/28/188912/21/1895Standard Plan of 1st Class Roundhouse Bill of MaterialBill of Material
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-16.1889.rev1895.1st Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-1712/28/188912/21/1895Standard Plan of 1st Class Roundhouse Bill of MaterialBill of Material
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-17.1889.rev1895.1st Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-173/28/1899n/aStandard Plan of 1st Class Roundhouse General Plan of PipingPlan View of Piping
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-17.1899.1st Class Roundhouse Piping.Schr.tif
  
RoundhouseS-32-1812/28/188912/21/1895Standard Plan of 2nd Class Roundhouse Bill of MaterialBill of Material
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-18.1889.rev1895.2nd Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-183/28/1899n/aStandard Plan of 1st Class Roundhouse Plan of Piping DetailsDetails for Steam Trap, Blower Pipe, Coils, Main Water Pipe
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-18.1899.1st Class Roundhouse Piping.Schr.tif
  
RoundhouseS-32-1912/28/188912/21/1895Standard Plan of 2nd Class Roundhouse Bill of MaterialBill of Material
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27
NPL P Schrenk18x24Chief EngineerS-32-19.1889.rev1895.2nd Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-198/24/18973/28/1899Standard Plan of 1st Class Roundhouse Plan of Piping DetailsDetails for Pipes and Piping Supports
S-32-1 to 19 Inclusive
NPL P Schrenk18x24Chief EngineerS-32-19.1897.rev1899.1st Class Roundhouse Piping.Schr.tif
  
RoundhouseS-32-2012/28/18897/8/1892Standard Plan of 2 Stall Frame Engine HouseGround Plan, Bill of Material
S-32-20, 21 & 22
NPL P Schrenk18x24Chief EngineerS-32-20.1889.rev1892.2-Stall Frame Engine House.Schr.tif
  
RoundhouseS-32-2112/28/188912/2/1891Standard Plan of 2 Stall Frame Engine HouseElevation, Framing and Cross Section
S-32-20, 21 & 22
NPL P Schrenk18x24Chief EngineerS-32-21.1889.rev1891.2-Stall Frame Engine House.Schr.tif
  
RoundhouseS-32-2212/28/1889n/aStandard Plan of 2 Stall Frame Engine House DetailsDorr Fasteners, Tie Rods
S-32-20, 21 & 22
NPL P Schrenk18x24Chief EngineerS-32-22.1889.2-Stall Frame Engine House Details.Schr.tif
  
RoundhouseS-32-225/29/1899n/aStandard Plan of 2nd Class RoundhouseGround Plan
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19 and
S-32-22 to 28 inclusive
NPL P Schrenk18x24Chief EngineerS-32-22.1899.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-2312/28/1889n/aStandard Plan of Details for RoundhousesTruck Stops for 66 lbs and 56 lbs Rails
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-23.1889.Roundhouse Details Truck Stops.Schr.tif
  
RoundhouseS-32-235/29/1899n/aStandard Plan of 2nd Class RoundhouseSection, Rear Elevation, Framing Plan
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19 and
S-32-22 to 28 inclusive
NPL P Schrenk18x24Chief EngineerS-32-23.1899.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-2412/28/18898/26/1897Standard Plan of Details for Roundhouses Blowoff PipesGround Plan and Elevations for Blowoff Pipes
S-32-1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 14, 16, 17, 23, 24 & 27 (1st Cl RH)
S-32-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 23, 24 & 27 (2nd Cl RH)
NPL P Schrenk18x24Chief EngineerS-32-24.1889.rev1897.2nd Class Roundhouse.Schr.tif
  
RoundhouseS-32-245/29/1899n/aStandard Plan of 2nd Class RoundhouseFront and Side Elevations
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19 and
S-32-22 to 28 inclusive
NPL P Schrenk18x24Chief EngineerS-32-24.1899.2nd Class Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-255/29/1899n/aStandard Plan of 2nd Class RoundhouseRoof Plan
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19 and
S-32-22 to 28 inclusive
NPL P Schrenk18x24Chief EngineerS-32-25.1899.2nd Class Roundhouse Roof.Schr.tif
  
RoundhouseS-32-265/29/1899n/aStandard Plan of 2nd Class Roundhouse DetailsDetails for Endwall/Rear Door, Windows, Cornice, Mouldings
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPL P Schrenk18x24Chief EngineerS-32-26.1899.2nd Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-271/2/1891n/aStandard Plan of Details for Roundhouses Tool Closet and Vice BenchDetails for Tool Closet and Vice Bench
not shown
NPL P Schrenk18x24Chief EngineerS-32-27.1891.Roundhouse Details Tool Closet.Schr.tif
  
RoundhouseS-32-275/29/1899n/aStandard Plan of 2nd Class Roundhouse DetailsDetail for Large Door Opening and Hinge Castings
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPL P Schrenk18x24Chief EngineerS-32-27.1899.2nd Class Roundhouse Details.Schr.tif
  
RoundhouseS-32-289/1/1897n/aStandard Plan of Roundhouses - General Plan of PipingGround Plan for Piping
not listed
NPL P Schrenk18x24Chief EngineerS-32-28.1897.Roundhouse Piping.Schr.tif
  
RoundhouseS-32-285/29/1899n/aStandard Plan of 2nd Class Roundhouse Bill of MaterialBill of Material
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPL P Schrenk18x24Chief EngineerS-32-28.1899.2nd Class Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-298/24/1897n/aStandard Plan of Roundhouses -  Plan of Piping DetailsGround Plan, Elevations, Sections for Piping
not listed
NPL P Schrenk18x24Chief EngineerS-32-29.1897.Roundhouse Piping.Schr.tif
  
RoundhouseS-32-507/5/19065/7/1907Standard Plan of 87 Ft Roundhouse  (85' Clear Inside)Ground Plan, Frogs for 80' and 85' turntable, Sections of Pit and Walls
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPL P Schrenk18x24Chief EngineerS-32-50.1906.rev1907.87-foot Roundhouse.Schr.tif
  
RoundhouseS-32-517/5/19065/7/1907Standard Plan of 87 Ft Roundhouse  (85' Clear Inside)Longitudinal Section
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPL P Schrenk18x24Chief EngineerS-32-51.1906.rev1907.87-foot Roundhouse.Schr.tif
  
RoundhouseS-32-527/5/1906n/aStandard Plan of 87 Ft Roundhouse  (85' Clear Inside)Roof Plan
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPL P Schrenk18x24Chief EngineerS-32-52.1906.87-foot Roundhouse.Schr.tif
  
RoundhouseS-32-537/5/1906n/aStandard Plan of 90 Ft & 87 Ft RoundhouseRear and Front Elevations
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.) S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPL P Schrenk18x24Chief EngineerS-32-53.1906.90 & 87-foot Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-547/5/1906n/aStandard Plan of 90 Ft & 87 Ft Roundhouse DetailsDetails of Cornice and Window On Roof
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59, 60 (87-Ft R.H.) S-32-75, 76, 77, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPL P Schrenk18x24Chief EngineerS-32-54.1906.90 & 87-foot Roundhouse Details.Schr.tif
  
RoundhouseS-32-55nd - prob 1906n/aStandard Plan of 90 Ft Brick Roundhouse DetailsDetail of Large Engine Door, 3-Sash Window
not listed
NPL P Schrenk18x24Chief EngineerS-32-55.nd.90-foot Brick Roundhouse Details.Schr.tif
  
RoundhouseS-32-567/5/19061/6/1908Standard Plan of 90 Ft & 87 Ft Roundhouse DetailsInside Elevation of Doors, Hinge Castings for Large Door and Firewall
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.) S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPL P Schrenk18x24Chief EngineerS-32-56.1906.rev1908.90 & 87-foot Roundhouse Details.Schr.tif
  
RoundhouseS-32-58nd - prob 1906n/aStandard Plan of 90 Ft Brick Roundhouse DetailsDetail of Fire Door, Door in Permanent End Wall , Hinge and Latch Details
not listed
NPL P Schrenk18x24Chief EngineerS-32-58.nd.90-foot Brick Roundhouse Details.Schr.tif
  
RoundhouseS-32-595/10/1906n/aStandard Plan of 87 Ft & 90 Ft Roundhouse DetailsDetail of Door in Permanent End Wall and Door Fasteners
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPL P Schrenk18x24Chief EngineerS-32-59.1906.90 & 87-foot Roundhouse Details.Schr.tif
  
RoundhouseS-32-6011/7/1906n/aStandard Plan of 87 Ft Roundhouse Detail of Engine PitDetail of Engine Pit
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPL P Schrenk18x24Chief EngineerS-32-60.1906.87-foot Roundhouse Detail.Schr.tif
  
RoundhouseS-32-74nd - prob 1906n/aStandard Plan of 90 Ft Roundhouse Bill of MaterialBill of Material
not listed
NPL P Schrenk18x24No approval signatureS-32-74.nd.90-foot Roundhouse BillMtl.Schr.tif
  
RoundhouseS-32-755/10/19069/28/1907Standard Plan of 90 Ft RoundhouseSection
S-32-75, 76, 77, 53, 54, 55, 56, and 57, 58, 59
NPL P Schrenk18x24No approval signatureS-32-75.1906.rev1907.90-foot Roundhouse.Schr.tif
  
RoundhouseS-32-765/10/19068/25/1906Standard Plan of 90 Ft RoundhouseGround Plan, Frogs for 80' and 85' turntable, Sections of Pit and Walls
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59
NPL P Schrenk18x24No approval signatureS-32-76.1906.rev1906.90-foot Roundhouse.Schr.tif
  
RoundhouseS-32-7711/13/19063/4/1908Standard Plan of 90 Ft Roundhouse Detail of Engine PitDetails of Engine Pit
S-32-75, 76, 77, 53, 54, 55, 56, and 57, 58, 59
NPL P Schrenk18x24No approval signatureS-32-77.1906.rev1908.90-foot Roundhouse Detail.Schr.tif
  
RoundhouseS-32-812/28/19075/7/1907Standard Plan of 90 Ft Frame Roundhouse Ground Plan, Frogs for 80' and 85' turntable, Sections of Pit and Walls
S-32-1, 2, 3, 4, 5 and also S-32-54, 56, 57 & 77
NPL P Schrenk18x24No approval signatureS-32-81.1907.rev1907.90-foot Frame Roundhouse.Schr.tif
  
RoundhouseS-32-822/28/19075/7/1907Standard Plan of 90 Ft Frame Roundhouse Longitudinal Section
not listed
NPL P Schrenk18x24No approval signatureS-32-82.1907.rev1907.90-foot Frame Roundhouse.Schr.tif
  
RoundhouseS-32-83nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse Rear and Front Elevations, Detail of Door in End Wall
not listed
NPL P Schrenk18x24No approval signatureS-32-83.nd.90-foot Frame Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-84nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse DetailsDetails of Cornice and Window On Roof
not listed
NPL P Schrenk18x24No approval signatureS-32-84.nd.90-foot Frame Roundhouse Detail.Schr.tif
  
RoundhouseS-32-85nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse Details of Large Engine Door and 3-Sash Window
not listed
NPL P Schrenk18x24No approval signatureS-32-85.nd.90-foot Frame Roundhouse Detail.Schr.tif
  
RoundhouseS-32-86nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse DetailsInside Door Elevation, Cross Section, Details of Hinge Castings
not listed
NPL P Schrenk18x24No approval signatureS-32-86.nd.90-foot Frame Roundhouse Detail.Schr.tif
  
RoundhouseS-32-87nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse DetailsDetails of Door Hardware
not listed
NPL P Schrenk18x24No approval signatureS-32-87.90-foot Roundhouses Details.Schr.tif
  
RoundhouseS-32-90nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse With Pile PitGround Plan with Section Through Pit
not listed
NPL P Schrenk18x24No approval signatureS-32-90.nd.90-foot Frame Roundhouse.Schr.tif
  
RoundhouseS-32-91nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse With Pile PitCross Section
not listed
NPL P Schrenk18x24No approval signatureS-32-91.nd.90-foot Frame Roundhouse.Schr.tif
  
RoundhouseS-32-93nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse With Pile PitRear and Front Elevations, Detail of Door in End Wall
not listed
NPL P Schrenk18x24No approval signatureS-32-93.nd.90-foot Frame Roundhouse Elevations.Schr.tif
  
RoundhouseS-32-94nd - prob 1907n/aStandard Plan of 90 Ft Frame Roundhouse - No PitGround Plan with Cross Section
not listed
NPL P Schrenk18x24No approval signatureS-32-94.nd.90-foot Frame Roundhouse.Schr.tif
  
RoundhouseS-32-1016/27/1906n/aStandard Plan of Reinforced Concrete Hot WellCross Section, Detail Section, Roof Plan
not listed
NPL P Schrenk18x24No approval signatureS-32-101.1906.Reinforced Concrete Hot Well.Schr.tif
  
ROW and Track10ndn/aStandard Plan of Passing Track DerailPlan Views and Details for Passing Track Derail
None Listed
NPM. Iszley18x24Chief Engineer10.nd.Passing Track Derail.Iszley.tif
  
Bridge151026torn off4/1/1928Details of Concrete Trestle with Moulded Pilings for Two Tracks 14 Foot CentersSections, Details, Bill of Materials
n/a
NPM. Iszley18x24Chief Engineer151026.1928.Conc Trestle.Iszley.tif
  
Bridge1510279/12/19223/2/1927Details of Concrete Trestle with Moulded Pilings for Two Tracks 13 Foot CentersGeneral Plan, Sections, Table of Dimensions
n/a
NPM. Iszley18x24Chief Engineer151027.1922.rev1927.Conc Trestle.Iszley.tif
  
Bridge151016-13/30/19188/14/1918Forms for Concrete ChimneySections
151016-1, 2
NPM. Iszley18x24Chief Engineer151016-1.1918.Conc Chimney.Iszley.tif
  
Bridge151016-23/30/19188/18/1920Forms for Concrete ChimneyDetails, Bill of Material
151016-1, 2
NPM. Iszley18x24Chief Engineer151017-2.1918.rev1920.Conc Chimney.Iszley.tif
  
Bridge151025-11/30/19221/20/1931Details of Concrete Trestle with Moulded PilingsDetails, Bill of Material, General Notes
n/a
NPM. Iszley18x24Chief Engineer151025-1.1922.Conc Trestle.Iszley.tif
  
Bridge1510xx-24/28/1909n/aDetails of Reinforced Concrete PileDetails, Bill of Material, General Notes
n/a
NPM. Iszley18x24Chief Engineer1510xx-2.1909.Details of Reinf Conc Pile.Iszley.tif
  
MailM-41-8A7/19/1901n/aStandard Plan of Columbian Mail Crane, as Manufactured by Columbian Mail Crane Company, Colubus, OhioPlan,  Elevation, and Details
Complete
NPM. Iszley18x24Chief EngineerM-41-08A.1901.Mail Crane.Iszley.tif
  
ScaleM-41-1110/28/18917/30/1900Standard Plan of Scale Foundation for Fairbanks 42-ft Iron Frame R.R. Track ScaleGround Plan, Sections, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerM-41-11.1891.rev1900.Scale Foundation.Iszley.tif
  
CoalM-41-1511/15/19023/8/1904Standard Plan of Coal Shed for StationsPlan, Section, Elevations, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerM-41-15.1902.rev1904.Coal Shed.Iszley.tif
  
ScaleM-41-507/29/1903n/aStandard Plan of Scale Foundation for Fairbanks 50-ft Iron Frame R.R. Track ScaleGround Plan, Sections, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerM-41-50.1903.Scale Foundation.Iszley.tif
  
ScaleM-41-518/1/1905n/aStandard Plan of Scale Foundation for Fairbanks 50-ft Iron Frame R.R. Track Scale, Capacity =125 tonsGround Plan, Sections, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerM-41-51.1905.Scale Foundation.Iszley.tif
  
DepotM-44-11/31/1902n/aStandard Plan of Telegraph OfficeGround Plan, Sections, Elevations, Framing, Rafters
Complete
NPM. Iszley18x24Chief EngineerM-44-1.1902.Telegraph Office.Iszley.tif
  
DepotM-44-102/6/1905n/aStandard Plan of Telegraph Office with Living RoomsGround Plan, Section, Elevations, Slat Partition [McDougall Plan)
Torn Off
NPM. Iszley18x24Chief EngineerM-44-10.1905.Telegraph Office.Iszley.tif
  
DepotM-44-112/2/1904n/aStandard Plan of Telegraph Office with Living Rooms - DetailsDetails of Wall Sections, Agent Counter, Slat Partition, Bay Window
M44-10, 11, 12 and S-26-24
NPM. Iszley18x24Chief EngineerM-44-11.1904.Telegraph Office Details.Iszley.tif
  
DepotM-44-122/2/1904n/aStandard Plan of Telegraph Office with Living Rooms - Bill of MaterialBill of Material
M44-10, 11, 12 and S-26-24
NPM. Iszley18x24Chief EngineerM-44-12.1904.Telegraph Office BillMtl.Iszley.tif
  
BridgeR-10-110/1/1898n/aStandard Plan of Howe Truss - 40 Ft Pony SpanElevation, Section and Plan Views
R-10-1, 27, 29 +30
NPM. Iszley18x24Chief EngineerR-10-01.1898.40ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-1010/1/1898n/aStandard Plan of Howe Truss - 110 Ft Through SpanElevation, Section and Plan Views
R-10-10, 27, 28, 41 +42
NPM. Iszley18x24Chief EngineerR-10-10.1898.110ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-1110/1/1898n/aStandard Plan of Howe Truss - 120 Ft Through SpanElevation, Section and Plan Views
R-10-11, 27, 28, 43 +44
NPM. Iszley18x24Chief EngineerR-10-11.1898.120ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-1210/1/1898n/aStandard Plan of Howe Truss - 130 Ft Through SpanElevation, Section and Plan Views
R-10-12, 27, 28, 45 +46
NPM. Iszley18x24Chief EngineerR-10-12.1898.130ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-1310/1/1898n/aStandard Plan of Howe Truss - 140 Ft Through SpanElevation, Section and Plan Views
R-10-13, 27, 28, 47 +48
NPM. Iszley18x24Chief EngineerR-10-13.1898.140ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-1410/1/1898n/aStandard Plan of Howe Truss - 150 Ft Through SpanElevation, Section and Plan Views
R-10-14, 27, 28, 49 +50
NPM. Iszley18x24Chief EngineerR-10-14.1898.150ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-1610/1/1898n/aStandard Plan of Howe Truss - 50 Ft Deck SpanElevation, Section and Plan Views
R-10-16, 27, 29, +52
NPM. Iszley18x24Chief EngineerR-10-16.1898.50ft Deck Howe Truss.Iszley.tif
  
BridgeR-10-210/1/1898n/aStandard Plan of Howe Truss - 44 Ft Pony SpanElevation, Section and Plan Views
R-10-2, 27, 29 +31
NPM. Iszley18x24Chief EngineerR-10-02.1898.44ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-2110/1/18987/7/1905Standard Plan of Howe Truss - 100 Ft Deck SpanElevation, Section and Plan Views
R-10-21, 27, 66, +67
NPM. Iszley18x24Chief EngineerR-10-21.1898.rev1905.100ft Deck Howe Truss.Iszley.tif
  
BridgeR-10-2310/1/1898n/aStandard Plan of Howe Truss - 120 Ft Deck SpanElevation, Section and Plan Views
R-10-23, 27, 29, 70 +71
NPM. Iszley18x24Chief EngineerR-10-23.1898.120ft Deck Howe Truss.Iszley.tif
  
BridgeR-10-2610/1/1898n/aStandard Plan of Howe Truss - 150 Ft Deck SpanElevation, Section and Plan Views
R-10-26, 27, 29, 76 +77
NPM. Iszley18x24Chief EngineerR-10-26.1898.150ft Deck Howe Truss.Iszley.tif
  
BridgeR-10-2710/1/1898n/aStandard Plan of Details for Howe TrussesSeparators, Lateral Brace Blocks
Complete Set for 40 ft Pony Span R-10-1, 27, 29, +30 Complete Set for 44 ft Pony Span R-10-2, 27, 29, +31 Complete Set for 50 ft Pony Span R-10-3, 27, 29, +32 Complete Set for 60 ft Pony Span R-10-4, 27, 29, +33 Complete Set for 65 ft Pony Span R-10-5, 27, 29, +34 Complete Set for 70 ft Pony Span R-10-6, 27, 29, +35 Complete Set for 80 ft Pony Span R-10-7, 27, 28, +36 Complete Set for 90 ft Through Span R-10-8, 27, 28, 37 +38 Complete Set for 100 ft Through Span R-10-9, 27, 28, 39 +40 Complete Set for 110 ft Through Span R-10-10, 27, 28, 41 +42 Complete Set for 120 ft Through Span R-10-11, 27, 28, 43 +44 Complete Set for 130 ft Through Span R-10-12, 27, 28, 45 +46 Complete Set for 140 ft Through Span R-10-13, 27, 28, 47 +48 Complete Set for 150 ft Through Span R-10-14, 27, 28, 49 +50 Complete Set for 50 ft Deck Span R-10-16, 27, 29, 52 Complete Set for 100 ft Deck Span R-10-21, 27, 29, 66-67 Complete Set for 120 ft Deck Span R-10-23, 27, 29, 70+71 Complete Set for 150 ft Deck Span R-10-26, 27, 29, 76+77
NPM. Iszley18x24Chief EngineerR-10-27.1898.Howe Truss Details.Iszley.tif
  
BridgeR-10-2810/1/1898n/aStandard Plan of Details for Howe TrussesClamp Heads, Chord Packing Blocks,  Clamp Head Covers, Angle Plates
Complete Set for 90 ft Through Span R-10-8, 27, 28, 37 +38 Complete Set for 100 ft Through Span R-10-9, 27, 28, 39 +40 Complete Set for 110 ft Through Span R-10-10, 27, 28, 41 +42 Complete Set for 120 ft Through Span R-10-11, 27, 28, 43 +44 Complete Set for 130 ft Through Span R-10-12, 27, 28, 45 +46 Complete Set for 140 ft Through Span R-10-13, 27, 28, 47 +48 Complete Set for 150 ft Through Span R-10-14, 27, 28, 49 +50
NPM. Iszley18x24Chief EngineerR-10-28.1898.Howe Truss Details.Iszley.tif
  
BridgeR-10-2910/1/1898n/aStandard Plan of Details for Howe TrussesLateral Brace Blocks, Chord Packing Blocks,  Clamp Heads and  Covers, Clamp Bars
Complete Set for 40 ft Pony Span R-10-1, 27, 29, +30 Complete Set for 44 ft Pony Span R-10-2, 27, 29, +31 Complete Set for 50 ft Pony Span R-10-3, 27, 29, +32 Complete Set for 60 ft Pony Span R-10-4, 27, 29, +33 Complete Set for 65 ft Pony Span R-10-5, 27, 29, +34 Complete Set for 70 ft Pony Span R-10-6, 27, 29, +35 Complete Set for 80 ft Pony Span R-10-7, 27, 28, +36 Complete Set for 50 ft Deck Span R-10-16, 27, 29, 52 Complete Set for 100 ft Deck Span R-10-21, 27, 29, 66-67 Complete Set for 120 ft Deck Span R-10-23, 27, 29, 70+71 Complete Set for 150 ft Deck Span R-10-26, 27, 29, 76+77
NPM. Iszley18x24Chief EngineerR-10-29.1898.Howe Truss Details.Iszley.tif
  
BridgeR-10-310/1/1898n/aStandard Plan of Howe Truss - 50 Ft Pony SpanElevation, Section and Plan Views
R-10-3, 27, 29 +31
NPM. Iszley18x24Chief EngineerR-10-03.1898.50ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-3010/1/1898n/aStandard Plan of Details & Bill of Material for 40 ft Pony TrussBrace Blocks, Materials
R-10-1, 27, 29 +30
NPM. Iszley18x24Chief EngineerR-10-30.1898.40ft Pony Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3110/1/1898n/aStandard Plan of Details & Bill of Material for 44 ft Pony TrussSteel Channels, Iron Plate, Brace Blocks, Materials
R-10-2, 27, 29 +31
NPM. Iszley18x24Chief EngineerR-10-31.1898.44ft Pony Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3210/1/1898n/aStandard Plan of Details & Bill of Material for 50 ft Pony TrussSteel Channels, Brace Blocks, Materials
R-10-3, 27, 29 +32
NPM. Iszley18x24Chief EngineerR-10-32.1898.50ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-32A5/18/1910n/aStandard Plan of Details & Bill of Material for 50 ft Howe TrussSteel Channels, Brace Blocks, Materials
R-10-3A, 32A, 27 +29
NPM. Iszley18x24Chief EngineerR-10-32A.1910.50ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3310/1/1898n/aStandard Plan of Details & Bill of Material for 60 ft Howe TrussSteel Channels, Brace Blocks, Materials
R-10-33-4, 27, 29 +33
NPM. Iszley18x24Chief EngineerR-10-33.1898.60ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3410/1/1898n/aStandard Plan of Details & Bill of Material for 65 ft Howe TrussSteel Channels, Brace Blocks, Materials
R-10-5, 27, 29 +34
NPM. Iszley18x24Chief EngineerR-10-34.1898.65ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3510/1/1898n/aStandard Plan of Details for 70 ft Howe TrussSteel Channels, Brace Blocks, Materials
R-10-6, 27, 29 +35
NPM. Iszley18x24Chief EngineerR-10-35.1898.70ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3610/1/1898n/aStandard Plan of Details & Bill of Material for 80 ft Howe TrussSteel Channels, Brace Blocks, Materials
R-10-7, 27, 29 +36
NPM. Iszley18x24Chief EngineerR-10-36.1898.80ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3710/1/1898n/aStandard Plan of Details for 90 ft Howe TrussSteel Channels, Brace Blocks
R-10-8, 27, 37 +38
NPM. Iszley18x24Chief EngineerR-10-37.1898.90ft Howe Truss Details.Iszley.tif
  
BridgeR-10-3810/1/1898n/aStandard Plan of Details & Bill of Materials for 90 ft Howe TrussEnd Brace Block, Materials
R-10-8, 27, 28, 37 +38
NPM. Iszley18x24Chief EngineerR-10-38.1898.90ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-3910/1/1898n/aStandard Plan of Details for 100 ft Howe TrussSteel Channels, Brace Blocks
R-10-9, 27, 28, 39 +40
NPM. Iszley18x24Chief EngineerR-10-39.1898.100ft Howe Truss Details.Iszley.tif
  
BridgeR-10-39A6/16/1909n/aStandard Plan of Details for 100 ft Howe TrussBrace Blocks
R-10-9A, 27, 28, 39A +40A
NPM. Iszley18x24Chief EngineerR-10-39A.1909.100ft Howe Truss Details.Iszley.tif
  
BridgeR-10-3A5/18/1910n/aStandard Plan of Howe Truss - 50 Ft Pony SpanElevation, Section and Plan Views
R-10-3A, 32A, 27, 29 +31
NPM. Iszley18x24Chief EngineerR-10-03A.1910.50ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-410/1/1898n/aStandard Plan of Howe Truss - 60 Ft Pony SpanElevation, Section and Plan Views
R-10-4, 27, 29 +33
NPM. Iszley18x24Chief EngineerR-10-04.1898.60ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-4010/1/1898n/aStandard Plan of Details & Bill of Material for 100 ft Howe TrussBrace Blocks, Materials
R-10-9, 27, 28, 39 +40
NPM. Iszley18x24Chief EngineerR-10-40.1898.100ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-40A6/16/1909n/aStandard Plan of Details & Bill of Material for 100 ft Through SpanBrace Blocks, Materials
R-10-9A, 27, 28, 39A +40A
NPM. Iszley18x24Chief EngineerR-10-40A.1909.100ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-4110/1/1898n/aStandard Plan of Details for 110 ft Howe TrussSteel Channels, Brace Blocks
R-10-10, 27, 28, 41 +42
NPM. Iszley18x24Chief EngineerR-10-41.1898.110ft Howe Truss Details.Iszley.tif
  
BridgeR-10-4210/1/1898n/aStandard Plan of Details & Bill of Material for 110 ft Howe TrussBrace Blocks, Materials
R-10-10, 27, 28, 41 +42
NPM. Iszley18x24Chief EngineerR-10-42.1898.110ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-4310/1/1898n/aStandard Plan of Details for 120 ft Howe TrussSteel Channels, Brace Blocks
R-10-11, 27, 28, 43 +44
NPM. Iszley18x24Chief EngineerR-10-43.1898.120ft Howe Truss Details.Iszley.tif
  
BridgeR-10-4410/1/1898n/aStandard Plan of Details & Bill of Material for 120 ft Howe TrussBrace Blocks, Materials
R-10-11, 27, 28, 43 +44
NPM. Iszley18x24Chief EngineerR-10-44.1898.120ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-4510/1/1898n/aStandard Plan of Details for 130 ft Howe TrussSteel Channels, Brace Blocks
R-10-12, 27, 28, 45 +46
NPM. Iszley18x24Chief EngineerR-10-45.1898.130ft Howe Truss Details.Iszley.tif
  
BridgeR-10-4610/1/1898n/aStandard Plan of Details & Bill of Material for 130 ft Howe TrussBrace Blocks, Materials
R-10-12, 27, 28, 45 +46
NPM. Iszley18x24Chief EngineerR-10-46.1898.130ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-4710/1/1898n/aStandard Plan of Details for 140 ft Howe TrussSteel Channels, Brace Blocks
R-10-13, 27, 28, 47 +48
NPM. Iszley18x24Chief EngineerR-10-47.1898.140ft Howe Truss Details.Iszley.tif
  
BridgeR-10-4810/1/1898n/aStandard Plan of Details & Bill of Material for 140 ft Howe TrussBrace Blocks, Materials
R-10-13, 27, 28, 47 +48
NPM. Iszley18x24Chief EngineerR-10-48.1898.140ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-4910/1/1898n/aStandard Plan of Details for 150 ft Howe TrussSteel Channels, Brace Blocks
R-10-14, 27, 28, 49 +50
NPM. Iszley18x24Chief EngineerR-10-49.1898.150ft Howe Truss Details.Iszley.tif
  
BridgeR-10-4A4/17/1906n/aStandard Plan of Howe Truss - 60 Ft Pony SpanElevation, Section and Plan Views
R-10-4A, 27 and (not legible)
NPM. Iszley18x24Chief EngineerR-10-04A.1906.60ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-510/1/1898n/aStandard Plan of Howe Truss - 65 Ft Pony SpanElevation, Section and Plan Views
R-10-5, 27, 29 +34
NPM. Iszley18x24Chief EngineerR-10-05.1898.65ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-5010/1/1898n/aStandard Plan of Details & Bill of Material for 150 ft Howe TrussBrace Blocks, Materials
R-10-14, 27, 28, 49 +50
NPM. Iszley18x24Chief EngineerR-10-50.1898.150ft Howe Truss Details BillMtl.Iszley.tif
  
BridgeR-10-5210/1/1898n/aStandard Plan of Details & Bill of Material for 50 ft Deck SpanBrace Blocks, Materials
R-10-16, 27, 29 +52
NPM. Iszley18x24Chief EngineerR-10-52.1898.50ft Deck Span Details BillMtl.Iszley.tif
  
BridgeR-10-6610/1/1898n/aStandard Plan of Details & Bill of Material for 100 ft Howe Truss Deck SpanBrace Blocks, Materials
R-10-21, 27, 29, 66 +67
NPM. Iszley18x24Chief EngineerR-10-66.1898.100ft Howe Deck Span Details BillMtl.Iszley.tif
  
BridgeR-10-6710/1/1898n/aStandard Plan of Details for 100 ft Howe Truss Deck SpanBrace Blocks
R-10-21, 27, 29, 66 +67
NPM. Iszley18x24Chief EngineerR-10-67.1898.100ft Howe Deck Span Details.Iszley.tif
  
BridgeR-10-710/1/1898n/aStandard Plan of Howe Truss - 80 Ft Pony SpanElevation, Section and Plan Views
R-10-7, 27, 29 +36
NPM. Iszley18x24Chief EngineerR-10-07.1898.80ft Pony Howe Truss.Iszley.tif
  
BridgeR-10-7010/1/1898n/aStandard Plan of Details & Bill of Material for 120 ft Howe Truss Deck SpanBrace Blocks, Materials
R-10-23, 27, 29, 70 +71
NPM. Iszley18x24Chief EngineerR-10-70.1898.120ft Howe Deck Span Details BillMtl.Iszley.tif
  
BridgeR-10-7110/1/1898n/aStandard Plan of Details for 120 ft Howe Truss Deck SpanBrace Blocks
R-10-23, 27, 29, 70 +71
NPM. Iszley18x24Chief EngineerR-10-71.1898.120ft Howe Deck Span Details.Iszley.tif
  
BridgeR-10-71A12/31/1891n/aStandard Plan of Details for 50 ft Pony TrussBrace Blocks, Materials
R-10, 52 +71
NPM. Iszley18x24Chief EngineerR-10-71A.1891.50ft Pony Truss Details BillMtl.Iszley.tif
  
BridgeR-10-7312/28/188912/31/1891Standard Plan of Details for 70 ft How TrussBrace Blocks, Materials
R-10, 55 +73
NPM. Iszley18x24Chief EngineerR-10-73.1889.rev1891.70ft Howe Truss Details.Iszley.tif
  
BridgeR-10-7610/1/1898n/aStandard Plan of Details for 150 ft Howe Truss Deck SpanSteel Channels, Brace Blocks
R-10, 26, 27, 29, 76 +77
NPM. Iszley18x24Chief EngineerR-10-76.1898.150ft Howe Deck Span Details.Iszley.tif
  
BridgeR-10-7710/1/1898n/aStandard Plan of Details & Bill of Material for 150 ft Howe Truss Deck SpanBrace Blocks, Materials
R-10-26, 27, 29, 76 +77
NPM. Iszley18x24Chief EngineerR-10-77.1898.150ft Howe Deck Span Details BillMtl.Iszley.tif
  
BridgeR-10-7811/8/1906n/aStandard Plan of Details for How TrussesBrace Blocks
Not listed
NPM. Iszley18x24Chief EngineerR-10-78.1906.Howe Truss Details.Iszley.tif
  
BridgeR-10-810/1/1898n/aStandard Plan of Howe Truss - 90 Ft Through SpanElevation, Section and Plan Views
R-10-8, 27, 28, 37 +38
NPM. Iszley18x24Chief EngineerR-10-08.1898.90ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-910/1/18987/7/1905Standard Plan of Howe Truss - 100 Ft Through SpanElevation, Section and Plan Views
R-10-9, 27, 28, 39 +40
NPM. Iszley18x24Chief EngineerR-10-09.1898.100ft Thru Howe Truss.Iszley.tif
  
BridgeR-10-903/3/1900n/aStandard Plan of Housig of How Trusses 90'-150' Spans InclusiveOutsideand Inside Elevations, Section, Materials
Not listed
NPM. Iszley18x24Chief EngineerR-10-90.1900.Housing of Howe Trusses.Iszley.tif
  
BridgeR-10-9A6/14/1909n/aStandard Plan of Howe Truss - 100 Ft Through SpanElevation, Section and Plan Views
R-10-9A, 27, 28, 39A +40A
NPM. Iszley18x24Chief EngineerR-10-09A.1909.100ft Thru Howe Truss.Iszley.tif
  
BridgeR-11-112/7/1898n/aStandard Plan of Pile TrestleElevation, Bents and Plan Views
Complete
NPM. Iszley18x24Chief EngineerR-11-1.1898.Pile Trestles.Iszley.tif
  
BridgeR-11-103/21/1905n/aStandard Plan of Pile BridgeElevation, Section, and Plan Views, Specifications
Not listed
NPM. Iszley18x24Chief EngineerR-11-10.1905.Pile Bridge.Iszley.tif
  
BridgeR-11-10C3/12/1912n/aStandard Plan of Double Track Pile TrestleElevation, Section, and Plan Views, Specifications
Not listed
NPM. Iszley18x24Chief EngineerR-11-10C.1912.Dbl Track Pile Trestle.Iszley.tif
  
BridgeR-11-2C4/23/191212/27/1927Standard Plan of High TrestleElevation, Bents and Plan Views
Not listed
NPM. Iszley18x24Chief EngineerR-11-2C.1912.High Trestle.Iszley.tif
  
BridgeR-11-2D4/2/1912n/aStandard Plan of Double Track High TrestleElevation, Section and Plan Views
Not listed
NPM. Iszley18x24Chief EngineerR-11-2D.1912 Dbl Track High Trestle.Iszley.tif
  
BridgeR-11-312/7/1898n/aStandard Plan for High Trestle Bill of MaterialMaterials
R-11-2 +3
NPM. Iszley18x24Chief EngineerR-11-3.1898.High Trestle BillMtl.Iszley.tif
  
BridgeR-11-3A12/7/189811/6/1905Standard Plan for High Trestle Bill of MaterialMaterials
R-11-2 +3
NPM. Iszley18x24Chief EngineerR-11-3A.1898.rev1905.High Trestle BillMtl.Iszley.tif
  
BridgeR-11-49/19/1902n/aStandard Plan of Pile Trestle with Ballasted DeckElevation, Section, and Plan Views, Materials
Not listed
NPM. Iszley18x24Chief EngineerR-11-4.1902.Pile Trestle Ballasted Deck.Iszley.tif
  
ROW and TrackR-12-14/1/19025/8/1905Standard Plan of SignsSigns for Section Post, Mile Post, Whistle Post, Tail Post
None Listed
NPM. Iszley18x24Chief EngineerR-12-1.1902.rev1905.Signs.Iszley.tif
  
ROW and TrackR-12-101/21/19049/28/1904Standard Plan of Cattle GuardGround Plan, Cross Sections, Longitudinal Section, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerR-12-10.1904.Cattle Guard.Iszley.tif
  
ROW and TrackR-12-212/7/1898n/aStandard Plan of SignsSigns for Yard Limit, Water One Mile, Flanger
None Listed
NPM. Iszley18x24Chief EngineerR-12-2.1898.Signs.Iszley.tif
  
ROW and TrackR-12-206/10/1904n/aStandard Plan of Highway CrossingGround Plan, Sections for rail sizes
Complete
NPM. Iszley18x24Chief EngineerR-12-20.1904.Highway Crossing.Iszley.tif
  
ROW and TrackR-12-712/7/1898n/aStandard Plan of Post Showing Brand of Rails and Extra Rail SupportGround Plan and Specification for Post, Elevation for Extra Rail Support
None Listed
NPM. Iszley18x24Chief EngineerR-12-7.1898.Signs.Iszley.tif
  
ROW and TrackR-12-88/23/1897n/aStandard Plan of Road CrossingGround Plan, Sections
Complete
NPM. Iszley18x24Chief EngineerR-12-8.1897.Road Crossing.Iszley.tif
  
ROW and TrackR-12-97/19/1901n/aStandard Plan of Tell Tale for Protection from Overhead ObstructionsElevations for Single and Double Tracks, Details, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerR-12-9.1901.Telltale.Iszley.tif
  
CulvertR-14-1112/28/1889n/aStandard Plan of 6-ft Arch CulvertLongitudinal, Transverse and Plan Views, Bills of Material
Complete
NPM. Iszley18x24Chief EngineerR-14-11.1889.rev1891.6ft Arch Culvert.Iszley.tif
  
CulvertR-14-1312/28/18891/6/1891Standard Plan of 8-ft Arch CulvertLongitudinal, Transverse and Plan Views, Bills of Material
Complete
NPM. Iszley18x24Chief EngineerR-14-13.1889.rev1891.8ft Arch Culvert.Iszley.tif
  
CulvertR-14-1412/28/18891/6/1891Standard Plan of 10-ft Arch CulvertLongitudinal, Transverse and Plan Views, Bills of Material
Complete
NPM. Iszley18x24Chief EngineerR-14-14.1889.rev1891.10ft Arch Culvert.Iszley.tif
  
CulvertR-14-1512/28/18891/6/1891Standard Plan of 12-ft Arch CulvertLongitudinal, Transverse and Plan Views, Bills of Material
Complete
NPM. Iszley18x24Chief EngineerR-14-15.1889.rev1891.12ft Arch Culvert.Iszley.tif
  
CulvertR-14-203/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 4- and 5-ft  Culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-20.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-213/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 6- and 7-ft  Culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-21.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-223/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 8-ft  Culvert
Complete
NPM. Iszley18x24Chief EngineerR-14-22.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-233/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 10-ft  Culvert
Complete
NPM. Iszley18x24Chief EngineerR-14-23.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-243/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 12-ft  Culvert
Complete
NPM. Iszley18x24Chief EngineerR-14-24.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-253/23/1900n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, 14-ft  Culvert
Complete
NPM. Iszley18x24Chief EngineerR-14-25.1900.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-412/28/1889n/aStandard Plan of Stone Box CulvertsLongitudinal and Transverse Sections, Bills of Material for 5x6, 5x5 and 3x3 Stone Box Culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-04.1889.Stone Box Culverts.Iszley.tif
  
CulvertR-14-512/28/1889n/aStandard Plan of Stone Box CulvertsLongitudinal and Transverse Sections, Bills of Material for 3x4, 4x4, and 4x5  Stone Box Culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-05.1889.Stone Box Culverts.Iszley.tif
  
CulvertR-14-503/14/1901n/aStandard Plan of Concrete Arch CulvertsLongitudinal and Transverse Sections, Double Arch Culvert
Complete
NPM. Iszley18x24Chief EngineerR-14-50.1901.Concrete Arch Culverts.Iszley.tif
  
CulvertR-14-7511/11/1903n/aStandard Plan of Rail Top Box  Culverts forshallow Banks and Side CutsLongitudinal and Transverse Sections, Bill of Materials for various sizes of rail top box culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-75.1903.Rail Top Box Culverts.Iszley.tif
  
CulvertR-14-7611/11/1903n/aStandard Plan of Rail Top Box  Culverts forshallow Banks and Side CutsLongitudinal and Transverse Sections, Bill of Materials for various sizes of rail top double culverts
Complete
NPM. Iszley18x24Chief EngineerR-14-76.1903.Rail Top Box Culverts.Iszley.tif
  
BridgeR-15-112/7/1898n/aStandard Plan of Pile Abutments for Spans from 131 to 160 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-1.1898.Pile Abutments 131-160 ft.Iszley.tif
  
BridgeR-15-1012/7/1898n/aStandard Plan of Enclosed Pile Piers for Spans from 81 to 100 FeetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-10.1898.Encl Pile Piers 81-100 ft.Iszley.tif
  
BridgeR-15-1112/7/1898n/aStandard Plan of Timber Piers for Spans from 131 to 160 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-11.1898.Timber Piers 131-160 ft.Iszley.tif
  
BridgeR-15-1212/7/1898n/aStandard Plan of Timber Piers for Spans from 81 to 130 FeetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-12.1898.Timber Piers 81-130 ft.Iszley.tif
  
BridgeR-15-1312/7/1898n/aStandard Plan of Timber Piers for Spans from 60 to 80 FeetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-13.1898.Timber Piers 60-80 ft.Iszley.tif
  
CulvertR-15-1612/7/1898n/aStandard Plan of Timber Box  CulvertsLongitudinal and Transverse Sections, Bill of Materials for 2x2, 3x3, and 4x4 timber box culverts
Complete
NPM. Iszley18x24Chief EngineerR-15-16.1898.Timber Box Culverts.Iszley.tif
  
CulvertR-15-178/21/1897n/aStandard Plan of Iron Pipe  CulvertsLongitudinal and Transverse Sections, Bill of Materials for 24", 30", 36", 42", 48", 54" and 60"  Cast Iron Pipe Culverts
Complete
NPM. Iszley18x24Chief EngineerR-15-17.1897.Cast Iron Pipes Culverts.Iszley.tif
  
CulvertR-15-1812/7/1898n/aStandard Plan of Iron Pipe  CulvertsJoint Details for 24", 30", 36", 42", 48", 54" and 60"  Cast Iron Pipe Culverts
Complete
NPM. Iszley18x24Chief EngineerR-15-18.1898.Cast Iron Culvert Pipes.Iszley.tif
  
BridgeR-15-212/7/1898n/aStandard Plan of Pile Abutments for Spans from 81 to 130 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-2.1898.Pile Abutments 81-130 ft.Iszley.tif
  
BridgeR-15-2012/28/1889n/aStandard Plan of Timber Ice BreakerElevation, Section, and Plan Views, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-20.1889.Timber Ice Breakers.Iszley.tif
  
BridgeR-15-312/7/1898n/aStandard Plan of Pile Abutments for Spans up to 80 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-3.1898.Pile Abutments Span up to 80 ft.Iszley.tif
  
BridgeR-15-412/7/1898n/aStandard Plan of Pile Piers for Spans from 131 to 160 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-4.1898.Pile Piers 131-160 ft.Iszley.tif
  
BridgeR-15-512/7/1898n/aStandard Plan of Pile Piers for Spans from 101 to 130 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-5.1898.Pile Piers 101-130 ft.Iszley.tif
  
BridgeR-15-612/7/1898n/aStandard Plan of Pile Piers for Spans from 81 to 100 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-6.1898.Pile Piers 81-100 ft.Iszley.tif
  
BridgeR-15-712/7/1898n/aStandard Plan of Pile Piers for Spans up to 80 feetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-7.1898.Pile Piers Spans up to 80 ft.Iszley.tif
  
BridgeR-15-812/7/1898n/aStandard Plan of Enclosed Pile Piers for Spans from 131 to 160 FeetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-8.1898.Encl Pile Piers 131-160 ft.Iszley.tif
  
BridgeR-15-912/7/1898n/aStandard Plan of Enclosed Pile Piers for Spans from 101 to 130 FeetElevation, Section, Materials
Complete
NPM. Iszley18x24Chief EngineerR-15-9.1898.Encl Pile Piers 101-130 ft.Iszley.tif
  
DepotS-26-111/14/1900n/aStandard Plan of 1st Class Combination DepotGround Plan, Front Elevation
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPM. Iszley18x24Chief EngineerS-26-1.1900.1st Class Combo.Iszley.tif
  
DepotS-26-1111/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Framing, Joist and Foundation Plans
S-26-9, 10, 11, 12, 13, 30, 31, 32
NPM. Iszley18x24Chief EngineerS-26-11.1900.2nd Class Combo 2Story.Iszley.tif
  
DepotS-26-1211/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Roof Plan, Wall Sections, Stair and Gable Window Details
S-26-9, 10, 11, 12, 13, 30, 31, 32
NPM. Iszley18x24Chief EngineerS-26-12.1900.2nd Class Combo 2Story.Iszley.tif
  
DepotS-26-1311/14/1900n/aStandard Plan of Second Class 2-Story Combination Depot Bill of MaterialBill of Material
S-26-9, 10, 11, 12, 13, 30, 31, 32
NPM. Iszley18x24Chief EngineerS-26-13.1900.2nd Class Combo 2Story BillMtl.Iszley.tif
  
DepotS-26-1611/14/1900n/aStandard Plan of 3rd Class Combination DepotJoist and Foundation Plan, Front Elevation, Section
S-26-14, 15, 16, 17, 30, 31, 32, 33
NPM. Iszley18x24Chief EngineerS-26-16.1900.3rd Class Combo.Iszley.tif
  
DepotS-26-1711/14/1900n/aStandard Plan of 3rd Class Combination Depot Bill of MaterialBill of Material
S-26-14, 15, 16, 17, 30, 31, 32, 33
NPM. Iszley18x24Chief EngineerS-26-17.1900.3rd Class Combo BillMtl.Iszley.tif
  
DepotS-26-211/14/1900n/aStandard Plan of 1st Class Combination DepotRoof Plan, End Elevation, Sections.  Torn upper right corner
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPM. Iszley18x24Chief EngineerS-26-2.1900.1st Class Combo.Iszley.tif
  
DepotS-26-2011/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot Framing, Joist and Foundation Plans
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33
NPM. Iszley18x24Chief EngineerS-26-20.1900.3rd Class Combo 2Story.Iszley.tif
  
DepotS-26-2111/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot Roof and Framing Plans, Details for Stairs, Trim
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33
NPM. Iszley18x24Chief EngineerS-26-21.1900.3rd Class Combo 2Story.Iszley.tif
  
DepotS-26-2211/14/1900n/aStandard Plan of 3rd Class 2-Story Combination Depot Bill of MaterialBill of Material
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33
NPM. Iszley18x24Chief EngineerS-26-22.1900.3rd Class Combo 2Story BillMtl.Iszley.tif
  
DepotS-26-231/1/1900n/aStandard Plan of 4th Class Combination DepotGround Plan, Elevations, Framing, Sections
S-26-23, 24, 25 & 32
NPM. Iszley18x24Chief EngineerS-26-23.1900.4th Class Combo.Iszley.tif
  
DepotS-26-23A10/7/1900n/aPlan of Special 4th Class Combination DepotFront Elevation, Ground Plan, Bill of Material to be added to Standard Plan S-26-25
S-26-23, 23A, 24, 25 & 32
NPM. Iszley18x24Chief EngineerS-26-23A.1900.Special 4th Class Combo.Iszley.tif
  
DepotS-26-241/1/1900n/aStandard Plan of 4th Class Combination DepotRoof Plan, Foundation Plan, Slat Partition, Bay Window Details, Moulding Detail
S-26-23, 24, 25 & 32
NPM. Iszley18x24Chief EngineerS-26-24.1900.4th Class Combo.Iszley.tif
  
DepotS-26-247/14/1905n/aStandard Plan of 4th Class Combination DepotSection, Slat Partion, Bay Window, Freight Room Door
None Listed
NPM. Iszley18x24Chief EngineerS-26-24.1905.4th Class Combo.Iszley.tif
  
DepotS-26-251/1/19005/1/1904Standard Plan of 4th Class Combination Depot Bill of MaterialBill of Material
S-26-23, 24, 25 & 32
NPM. Iszley18x24Chief EngineerS-26-25.1900.4th Class Combo BillMtl.Iszley.tif
  
DepotS-26-311/14/1900n/aStandard Plan of 1st Class Combination DepotJoist Foundation Plan, Front Elevation, Sections
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPM. Iszley18x24Chief EngineerS-26-3.1900.1st Class Combo.Iszley.tif
  
DepotS-26-3011/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Ticket Window and Shelf, Sections through Walls, Bay Window, Eave Bracket
S-26-1, 2, 3, 4, 30, 31, 32 (1st Class)
S-26- 5, 6, 7, 8, 30, 31, 32 (2nd Class)
S-26-9, 10, 11, 12, 13, 30, 31, 32 (2nd Cl 2-St)
S-26-14, 15, 16, 17, 30, 31, 32, 33 (3rd Class)
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 (3rd Cl 2-St)
NPM. Iszley18x24Chief EngineerS-26-30.1900.Combo Details.Iszley.tif
  
DepotS-26-3111/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Dormer, Freight Rm Door, Wire Gate, Ironwork
S-26-1, 2, 3, 4, 30, 31, 32 (1st Class)
S-26- 5, 6, 7, 8, 30, 31, 32 (2nd Class)
S-26-9, 10, 11, 12, 13, 30, 31, 32 (2nd Cl 2-St)
S-26-14, 15, 16, 17, 30, 31, 32, 33 (3rd Class)
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 (3rd Cl 2-St)
NPM. Iszley18x24Chief EngineerS-26-31.1900.Combo Details.Iszley.tif
  
DepotS-26-3211/14/1900n/aStandard Plan of Combination Depots DetailsDetails of Finials, Mouldings, Brackets, Hinges
S-26-1, 2, 3, 4, 30, 31, 32 (1st Class)
S-26- 5, 6, 7, 8, 30, 31, 32 (2nd Class)
S-26-9, 10, 11, 12, 13, 30, 31, 32 (2nd Cl 2-St)
S-26-14, 15, 16, 17, 30, 31, 32, 33 (3rd Class)
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 (3rd Cl 2-St)
NPM. Iszley18x24Chief EngineerS-26-32.1900.Combo Depot Details.Iszley.tif
  
DepotS-26-3311/14/19005/1/1902Standard Plan of 3rd Class Combination Depot DetailsDetails of Slat Partition
S-26-14, 15, 16, 17, 30, 31, 32, 33 (3rd Class)
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 (3rd Cl 2-St)
NPM. Iszley18x24Chief EngineerS-26-33.1900.3rd Class Combo Details.Iszley.tif
  
DepotS-26-348/12/1901n/aStandard Plan of Operators Table for DepotsSpecifications, Plan and Section Viewsof Operator Table
S-26-1, 2, 3, 4, 30, 31, 32, & 34 (1st Class)
S-26- 5, 6, 7, 8, 30, 31, 32 & 34 (2nd Class)
S-26-9, 10, 11, 12, 13, 30, 31, 32 & 34 (2nd Cl 2-St)
S-26-14, 15, 16, 17, 30, 31, 32, 33 & 34 (3rd Class)
S-26-18, 19, 20, 21, 22, 30, 31, 32, 33 & 34 (3rd Cl 2-St)
NPM. Iszley18x24Chief EngineerS-26-34.1901.Operators Table.Iszley.tif
  
DepotS-26-369/15/1896n/aStandard Plan of Cinder PlatformGeneral Plan, Elevation, Sections
None Listed
NPM. Iszley18x24Chief EngineerS-26-36.1896.Cinder Platform.Iszley.tif
  
DepotS-26-411/14/1900n/aStandard Plan of 1st Class Combination Depot Bill of MaterialBill of Material
S-26-1, 2, 3, 4, 30, 31, 32, & 34
NPM. Iszley18x24Chief EngineerS-26-4.1900.1st Class Combo BillMtl.Iszley.tif
  
DepotS-26-501/17/19057/28/1905Standard Plan of Station SignalElevations, Details, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerS-26-50.1905.Station Signal.Iszley.tif
  
DepotS-26-711/14/1900n/aStandard Plan of 2nd Class Combination DepotJoist Foundation Plan, Front Elevation, Sections
S-26- 5, 6, 7, 8, 30, 31, 32 & 34
NPM. Iszley18x24Chief EngineerS-26-7.1900.2nd Class Combo.Iszley.tif
  
DepotS-26-704/24/1905n/aStandard Plan of Umbrella ShedSide Elevation, Cross Section
None Listed
NPM. Iszley18x24Chief EngineerS-26-70.1905.Umbrella Shed.Iszley.tif
  
DepotS-26-811/14/1900n/aStandard Plan of Second Class Combination Depot Bill of MaterialBill of Material
S-26- 5, 6, 7, 8, 30, 31, 32
NPM. Iszley18x24Chief EngineerS-26-8.1900.2nd Class Combo BillMtl.Iszley.tif
  
IceS-27-41A10/21/1902n/aStandard Plan of 50 Ton Ice HousePlan View, Elevations, Framing, Sections, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerS-27-41A.1902.50 ton Ice House.Iszley.tif
  
IceS-27-502/9/190511/23/1905Standard Plan of Ice HousesGround Plan and Elevation for 2900 ton ice house, Sketches Showing Dimensions for 2200-ton, 1400-ton, 1100-ton and 850-ton Ice Houses
None Listed
NPM. Iszley18x24Chief EngineerS-27-50.1905. Ice Houses.Iszley.tif
  
StockS-31-17/11/18904/11/1905Standard Plan of Stock Yard - Capacity 5 carsPlan View, Bill of Materials
S-31-1, 7, 8 & 9
NPM. Iszley18x24Chief EngineerS-31-1.1890.rev1905.5-car Stock Yard.Iszley.tif
  
StockS-31-107/11/18909/16/1890Standard Plan of Stock Yard - DetailsGeneral Plan View, Elevation, Sections for Hay Barn and Shelter Shed
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
NPM. Iszley18x24Chief EngineerS-31-10.1890.Stock Yard Details.Iszley.tif
  
StockS-31-117/11/1890n/aStandard Plan of Stock Yard - DetailsDetails of Single Stock Chute, Shelter Shed, Bill of Materials
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
NPM. Iszley18x24Chief EngineerS-31-11.1890.Stock Yard Details.Iszley.tif
  
StockS-31-122/16/1891n/aStandard Plan of Stock Yard For Loading of Range Cattle - Capacity 50 carsPlan View, Bill of Materials
S-31-8, 9, 12, 13 & 14
NPM. Iszley18x24Chief EngineerS-31-12.1891.50-car Stock Yard.Iszley.tif
  
StockS-31-132/16/1891n/aStandard Plan of Stock Yard For Loading of Range Cattle - DetailsGeneral Plan View and Sections for Chute and Gate
S-31-8, 9, 12, 13 & 14
NPM. Iszley18x24Chief EngineerS-31-13.1891.Stock Yard Details.Iszley.tif
  
StockS-31-142/16/1891n/aStandard Plan of Stock Yard For Loading of Range Cattle - Detail of SqueezerGeneral Plan, Sections, and Iron Hinge for Squeezer
S-31-8, 9, 12, 13 & 14
NPM. Iszley18x24Chief EngineerS-31-14.1891.Stock Yard Details.Iszley.tif
  
StockS-31-157/13/18964/11/1905Standard Plan of Double Deck Stock ChuteGround Plan, Elevations, Sections, Gates, Hardware, Bill of Materials
Complete - 1 sheet
NPM. Iszley18x24Chief EngineerS-31-15.1896.rev1905.Dbl Deck Stock Chute.Iszley.tif
  
StockS-31-27/11/18902/25/1891Standard Plan of Stock Yard - Capacity 10 carsPlan View, Bill of Materials
S-31-2 ,7, 8, 9 & 11
NPM. Iszley18x24Chief EngineerS-31-2.1890.rev1891.10-car Stock Yard.Iszley.tif
  
StockS-31-37/11/18902/25/1891Standard Plan of Stock Yard - Capacity 15 carsPlan View, Bill of Materials
S-31-3 ,7, 8, 9 & 11
NPM. Iszley18x24Chief EngineerS-31-3.1890.rev1891.15-car Stock Yard.Iszley.tif
  
StockS-31-47/11/18902/25/1891Standard Plan of Stock Yard - Capacity 20 carsPlan View, Bill of Materials
S-31-4 ,7, 8, 9 & 11
NPM. Iszley18x24Chief EngineerS-31-4.1890.rev1891.20-car Stock Yard.Iszley.tif
  
StockS-31-57/11/18902/25/1891Standard Plan of Stock Yard - Capacity 50 carsPlan View, Bill of Materials
S-31-5 ,7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-31-5.1890.rev1891.50-car Stock Yard.Iszley.tif
  
StockS-31-67/11/18902/25/1891Standard Plan of Stock Yard - Capacity 100 carsPlan View, Bill of Materials
S-31-56,7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-31-6.1890.rev1891.100-car Stock Yard.Iszley.tif
  
StockS-31-72/21/1891n/aStandard Plan of Stock Yard - Detail of ChutesGeneral Plan View, Elevation, Sections
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
NPM. Iszley18x24Chief EngineerS-31-7.1891.Stock Yard Details.Iszley.tif
  
StockS-31-87/11/18909/16/1890Standard Plan of Stock Yard - DetailsGates, Hay and Water Troughs, Hay Shutters
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
S-31-8, 9, 12, 13 & 14 (50 cars yard for loading range cattle)
NPM. Iszley18x24Chief EngineerS-31-8.1890.Stock Yard Details.Iszley.tif
  
StockS-31-97/11/1890n/aStandard Plan of Stock Yard - Details of Iron WorkIron Work
S-31-1, 7, 8 & 9 (5 cars yard)
S-31-2 ,7, 8, 9 & 11 (10 cars yard)
S-31-3, 7, 8, 9 & 11 (15 cars yard)
S-31-4, 7, 8, 9 & 11 (20 cars yard)
S-31-5, 7, 8, 9 & 10 (50 cars yard)
S-31-6, 7, 8, 9 & 10 (100 cars yard)
S-31-8, 9, 12, 13 & 14 (50 cars yard for loading range cattle)
NPM. Iszley18x24Chief EngineerS-31-9.1890.Stock Yard Details Ironwork.Iszley.tif
  
RoundhouseS-32-13/1/1899n/aStandard Plan of 1st Class RoundhouseGround Plan
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-1.1899.1st Class Roundhouse.Iszley.tif
  
RoundhouseS-32-103/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Spring Locks, Rail Anchors, Hinges
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-10.1899.1st Class Roundhouse Details.Iszley.tif
  
RoundhouseS-32-113/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Latch, Fire Door, Cast Iron Grates, Hinge Castings
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-11.1899.1st Class Roundhouse Details.Iszley.tif
  
RoundhouseS-32-133/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Smokejack, Damper
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-13.1899.1st Class Roundhouse Details Smokejack.Iszley.tif
  
RoundhouseS-32-143/1/1899n/aStandard Plan of 1st Class Roundhouse Tool Closet and Vice BenchPlan Views, Sections and Bill of Materials for Tool Closet and Vice Bench
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-14.1899.1st Class Roundhouse Details Tool Closet.Iszley.tif
  
RoundhouseS-32-154/7/1899n/aStandard Plan of 1st Class Roundhouse Bill of MaterialBill of Material
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-15.1899.1st Class Roundhouse BillMtl.Iszley.tif
  
RoundhouseS-32-183/28/1899n/aStandard Plan of 1st Class Roundhouse Plan of Piping DetailsDetails for Steam Trap, Blower Pipe, Coils, Main Water Pipe
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-18.1899.1st Class Roundhouse Piping.Iszley.tif
  
RoundhouseS-32-198/24/18973/28/1899Standard Plan of 1st Class Roundhouse Plan of Piping DetailsDetails for Pipes and Piping Supports
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-19.1897.rev1899.1st Class Roundhouse Piping.Iszley.tif
  
RoundhouseS-32-23/1/1899n/aStandard Plan of 1st Class RoundhouseSection, Firewall End Elevation
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-2.1899.1st Class Roundhouse.Iszley.tif
  
RoundhouseS-32-255/29/1899n/aStandard Plan of 2nd Class RoundhouseRoof Plan
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPM. Iszley18x24Chief EngineerS-32-25.1899.2nd Class Roundhouse Roof.Iszley.tif
  
RoundhouseS-32-265/29/1899n/aStandard Plan of 2nd Class Roundhouse DetailsDetails for Endwall/Rear Door, Windows, Cornice, Mouldings
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPM. Iszley18x24Chief EngineerS-32-26.1899.2nd Class Roundhouse Details.Iszley.tif
  
RoundhouseS-32-275/29/1899n/aStandard Plan of 2nd Class Roundhouse DetailsDetail for Large Door Opening and Hinge Castings
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPM. Iszley18x24Chief EngineerS-32-27.1899.2nd Class Roundhouse Details.Iszley.tif
  
RoundhouseS-32-285/29/1899n/aStandard Plan of 2nd Class Roundhouse Bill of MaterialBill of Material
S-32-6, 9, 10, 12, 13, 14, 16, 17, 18, & 19
NPM. Iszley18x24Chief EngineerS-32-28.1899.2nd Class Roundhouse BillMtl.Iszley.tif
  
RoundhouseS-32-33/1/1899n/aStandard Plan of 1st Class RoundhouseFront, Rear and Permanent End Wall Elevations
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-3.1899.1st Class Roundhouse Elevations.Iszley.tif
  
RoundhouseS-32-324/24/190610/2/1907Standard Plan of Wooden Smokejack for Round HousesElevation, Sections and Details
Complete - 1 sheet
NPM. Iszley18x24Chief EngineerS-32-32.1906.rev1907.Wooden Smoke Jack.Iszley.tif
  
RoundhouseS-32-353/14/1902n/aStandard Plan of Ash Pit and Ash ConveyorGround Plan, Sections, and Sketch of Gearing
S-32-35 and 36
NPM. Iszley18x24Chief EngineerS-32-35.1902.Ash Pit and Conveyor.Iszley.tif
  
RoundhouseS-32-363/14/1902n/aStandard Plan of Ash Pit and Ash Conveyor DetailsDetails of Cast Iron Fittings
S-32-35 and 36
NPM. Iszley18x24Chief EngineerS-32-36.1902.Ash Pit and Conveyor Details.Iszley.tif
  
RoundhouseS-32-43/1/1899n/aStandard Plan of 1st Class RoundhouseGeneral Plan, Roof Plan, Section of Walls
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-4.1899.1st Class Roundhouse.Iszley.tif
  
RoundhouseS-32-53/1/1899n/aStandard Plan of 1st Class RoundhousePile Foundation and Centering for Door Arches
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-5.1899.1st Class Roundhouse.Iszley.tif
  
RoundhouseS-32-507/5/190611/7/1906Standard Plan of 87 Ft Roundhouse  (85' Clear Inside)Ground Plan, Frogs for 80' and 85' turntable, Sections of Pit and Walls
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPM. Iszley18x24Chief EngineerS-32-50.1906.rev1906.87-ft Roundhouse.Iszley.tif
  
RoundhouseS-32-517/5/1906n/aStandard Plan of 87 Ft Roundhouse  (85' Clear Inside)Longitudinal Section
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPM. Iszley18x24Chief EngineerS-32-51.1906.87-foot Roundhouse.Iszley.tif
  
RoundhouseS-32-527/5/1906n/aStandard Plan of 87 Ft Roundhouse  (85' Clear Inside)Roof Plan
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPM. Iszley18x24Chief EngineerS-32-52.1906.87-foot Roundhouse.Iszley.tif
  
RoundhouseS-32-537/5/1906n/aStandard Plan of 90 Ft & 87 Ft RoundhouseRear and Front Elevations
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-53.1906.90 and 87-foot Roundhouse Elevations.Iszley.tif
  
RoundhouseS-32-547/5/1906n/aStandard Plan of 90 Ft & 87 Ft Roundhouse DetailsDetails of Cornice and Window On Roof
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59, 60 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59, 77 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-54.1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-557/5/1906n/aStandard Plan of 90 Ft & 87 Ft Roundhouse DetailsDetail of Large Engine Door, 3-Sash Window
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 , 77 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-55.1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-567/5/19061/6/1908Standard Plan of 90 Ft & 87 Ft Roundhouse DetailsInside Elevation of Doors, Hinge Castings for Large Door and Firewall
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-56.1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-577/5/19066/13/1907Standard Plan of 90 Ft & 87 Ft Roundhouse DetailsPlan Showing Hot Air Branch Pipes to Engine Pits
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59, 60 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59, 77 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-57.1906.rev1907.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-57A7/5/19066/13/1907Standard Plan of 90 Ft & 87 Ft Roundhouse DetailsPlan Showing Hot Air Branch Pipes to Engine Pits
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59, 60 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59, 77 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-57A.1906.rev1907.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-57B7/5/190611/13/1906Standard Plan of 90 Ft & 87 Ft Roundhouse DetailsPlan Showing Hot Air Branch Pipes to Engine Pits
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59, 60 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59, 77 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-57B.1906.rev1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-585/10/1906n/aStandard Plan of 90 Ft & 87 Ft Roundhouse DetailsDetail of Fire Door, Door in Permanent End Wall , Hinge and Latch Details
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-58.1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-595/10/1906n/aStandard Plan of 90 Ft & 87 Ft Roundhouse DetailsDetail of Door in Permanent End Wall and Door Fasteners
S-32-50, 51, 52, 53, 54, 55, 56, and 57, 58, 59 (87-Ft R.H.)
S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 (90-Ft R.H.)
NPM. Iszley18x24Chief EngineerS-32-59.1906.90 and 87-foot Roundhouse Details.Iszley.tif
  
RoundhouseS-32-6011/7/1906n/aStandard Plan of 87 Ft Roundhouse Detail of Engine PitDetail of Engine Pit
S-32-51, 52, 53, 54, 55, 56, and 57, 58, 59, 60
NPM. Iszley18x24Chief EngineerS-32-60.1906.87-foot Roundhouse Detail.Iszley.tif
  
RoundhouseS-32-73/1/1899n/aStandard Plan of 1st Class Roundhouse DetailsDetails of Doors and Windows
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-7.1899.1st Class Roundhouse Details.Iszley.tif
  
RoundhouseS-32-735/10/190611/13/1906Standard Plan of 90 Ft RoundhouseSection

S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 , 77
NPM. Iszley18x24Chief EngineerS-32-73.1906.rev1906.90-foot Roundhouse.Iszley.tif
  
RoundhouseS-32-765/10/190611/13/1906Standard Plan of 90 Ft RoundhouseGround Plan,  Roof Framing, Cross Section of Pit

S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 , 77
NPM. Iszley18x24Chief EngineerS-32-76.1906.rev1906.90-foot Roundhouse.Iszley.tif
  
RoundhouseS-32-7711/13/1906n/aStandard Plan of 90 Ft Roundhouse Detail of Engine PitGround Plan and Sections of Engine Pit, Detail of Cast Iron Strainer

S-32-75, 76, 53, 54, 55, 56, and 57, 58, 59 , 78
NPM. Iszley18x24Chief EngineerS-32-77.1906.90-foot Roundhouse Detail of Eng Pit.Iszley.tif
  
RoundhouseS-32-83/1/1899n/aStandard Plan of 1st Class Roundhouse Cut StoneSpecification for Cut Stone Details
S-32-1 to 19 Inclusive
NPM. Iszley18x24Chief EngineerS-32-8.1899.1st Class Roundhouse Cut Stone.Iszley,tif
  
TurntableS-35-1110/7/1898n/aStandard Plan of Floor and Foundation for 64' 4" Turntable, Philadelphia Bridge WorksGround Plan, Turntable Section, Foundation, Bill of Material. References Philadelphia Bridge Works Drawing No. 23861
S-35-7 and 11
NPM. Iszley18x24Chief EngineerS-35-11.1898.64ft Turntable.Iszley.tif
  
TurntableS-35-125/15/1903n/aStandard Plan of Floor and Foundation for 70 ft Half Through TurntableGround Plan, Turntable Section, Foundation, Bill of Material
S-35-7 and 12
NPM. Iszley18x24Chief EngineerS-35-12.1903.70 ft Turntable.Iszley.tif
  
TurntableS-35-145/2/19058/17/1905Standard Plan of Floor and Foundation for 80 ft TurntableGround Plan, Turntable Section, Foundation, Bill of Material
not listed
NPM. Iszley18x24Chief EngineerS-35-14.1905.rev1905.80ft Turntable.Iszley.tif
  
TurntableS-35-151/30/19058/17/1905Standard Plan of Floor and Foundation for 85 ft TurntableGround Plan, Turntable Section, Foundation, Bill of Material
S-35-7 and 15
NPM. Iszley18x24Chief EngineerS-35-15.1905.rev1905.85ft Turntable.Iszley.tif
  
CoalS-36-14011/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksCross  Section
not listed
NPM. Iszley18x24Chief EngineerS-36-140.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14111/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksSections
not listed
NPM. Iszley18x24Chief EngineerS-36-141.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14211/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksPlan View
not listed
NPM. Iszley18x24Chief EngineerS-36-142.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14311/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksRear, End and Truss Elevations
not listed
NPM. Iszley18x24Chief EngineerS-36-143.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-1445/10/190611/29/1907Standard Plan of Coal Dock to Serve Three TracksPocket Liing Details
not listed
NPM. Iszley18x24Chief EngineerS-36-144.1906.rev1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14511/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksGround Plan, Front and Truss Elevations
not listed
NPM. Iszley18x24Chief EngineerS-36-145.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14611/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksHopper, Trough, and Bucket Details
not listed
NPM. Iszley18x24Chief EngineerS-36-146.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14711/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksSections through Upper and Bottom Troughs
not listed
NPM. Iszley18x24Chief EngineerS-36-147.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-14811/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksCast Iron Details
not listed
NPM. Iszley18x24Chief EngineerS-36-148.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-1495/10/190611/29/1907Standard Plan of Coal Dock to Serve Three Tracks - Details of Double ChuteDetails of Double Chute
not listed
NPM. Iszley18x24Chief EngineerS-36-149.1906.rev1907.Coal Dock for 3 Tracks Dbl Chute Details.Iszley.tif
  
CoalS-36-1505/10/190611/29/1907Standard Plan of Coal Dock to Serve Three Tracks - Details of  ChuteDetails of Single Chute
not listed
NPM. Iszley18x24Chief EngineerS-36-150.1906.rev1907.Coal Dock for 3 Tracks Chute Details.Iszley.tif
  
CoalS-36-15111/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksDetails of Hoist Mechanism
not listed
NPM. Iszley18x24Chief EngineerS-36-151.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-15211/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksGround Plans and Elevations for Engine House
not listed
NPM. Iszley18x24Chief EngineerS-36-152.1907.Coal Dock for 3 Tracks.Iszley.tif
  
CoalS-36-15311/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksBill of Material
not listed
NPM. Iszley18x24Chief EngineerS-36-153.1907.Coal Dock for 3 Tracks BillMtl.Iszley.tif
  
CoalS-36-15411/29/1907n/aStandard Plan of Coal Dock to Serve Three TracksBill of Material
not listed
NPM. Iszley18x24Chief EngineerS-36-154.1907.Coal Dock for 3 Tracks BillMtl.Iszley.tif
  
CoalS-36-163/1/1899n/aStandard Plan of Coal Chute with Single Row of PocketsFront Elevation, Cross Section, Longitudinal Section
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26
NPM. Iszley18x24Chief EngineerS-36-16.1899.Coal Chute Single Row of Pockets.Iszley.tif
  
CoalS-36-173/1/1899n/aStandard Plan of Coal Chute with Single Row of PocketsGeneral Plan, Ground Plan
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26
NPM. Iszley18x24Chief EngineerS-36-17.1899.Coal Chute Single Row of Pockets.Iszley.tif
  
CoalS-36-183/1/1899n/aStandard Plan of Coal Chute with Single Row of PocketsTop View, Sections
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26
NPM. Iszley18x24Chief EngineerS-36-18.1899.Coal Chute Single Row of Pockets.Iszley.tif
  
CoalS-36-204/20/1998n/aStandard Plan of Coal Chute For Pockets of 35 tons Capacity Each - DetailsConveyor and Gate Sections, Trough Lining
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26 (Single Row of Pockets)
S-36-20, 25, 26, 27, 28, 29, 30, 31, and 32 (Double Row of Pockets)
NPM. Iszley18x24Chief EngineerS-36-20.1898.Coal Chute Details for 35-ton Pockets.Iszley.tif
  
CoalS-36-213/1/1899n/aStandard Plan of Coal Chute with Single Row of Pockets Bill of MaterialBill of Material
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26
NPM. Iszley18x24Chief EngineerS-36-21.1899.Coal Chute Single Row of Pockets BillMtl.Iszley.tif
  
CoalS-36-223/1/189911/16/1900Standard Plan of Coal Chute with Single Row of Pockets Bill of MaterialBill of Material
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 27
NPM. Iszley18x24Chief EngineerS-36-22.1899.rev1900.Coal Chute Single Row of Pockets BillMtl.Iszley.tif
  
CoalS-36-253/1/1899n/aStandard Plan of Coal Chute For Pockets of 35 tons Capacity Each - DetailsSide Elevation of Pocket, Section Through Gate and Apron, Details of Pocket Gate and Hopper Gate
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26 (Single Row of Pockets)
S-36-20, 25, 26, 27, 28, 29, 30, 31, and 32 (Double Row of Pockets)
NPM. Iszley18x24Chief EngineerS-36-25.1899.Coal Chute Details for 35-ton Pockets.Iszley.tif
  
CoalS-36-263/1/189911/16/1900Standard Plan of Coal Chute For Pockets of 35 tons Capacity Each - DetailsDetails of Dynamometer, Gate Roller, Counterweight
S-36-16, 17, 18, 19, 20, 21, 22, 25 and 26 (Single Row of Pockets)
S-36-20, 25, 26, 27, 28, 29, 30, 31, and 32 (Double Row of Pockets)
NPM. Iszley18x24Chief EngineerS-36-26.1899.rev1900.Coal Chute Details for 35-ton Pockets.Iszley.tif
  
CoalS-36-273/1/1899n/aStandard Plan of Double Pocket Coal ChuteGround Plan
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-27.1899.Double Pocket Coal Chute.Iszley.tif
  
CoalS-36-283/1/1899n/aStandard Plan of Double Pocket Coal ChuteLongitudinal Section
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-28.1899.Double Pocket Coal Chute.Iszley.tif
  
CoalS-36-297/15/18983/1/1899Standard Plan of Double Pocket Coal ChuteSection, Elevation at Hopper End
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-29.1898.rev1899.Double Pocket Coal Chute.Iszley.tif
  
CoalS-36-303/1/1899n/aStandard Plan of Double Pocket Coal ChuteGeneral Plan, Sections, End Bent, Top View Over Hopper
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-30.1899.Double Pocket Coal Chute.Iszley.tif
  
CoalS-36-313/1/1899n/aStandard Plan of Double Pocket Coal ChuteBill of Material
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-31.1899.Double Pocket Coal Chute BillMtl.Iszley.tif
  
CoalS-36-323/1/189911/16/1900Standard Plan of Double Pocket Coal ChuteBill of Material
S-36-19, 20, 25, 26, 27, 28, 29, 30, 31 & 32
NPM. Iszley18x24Chief EngineerS-36-32.1899.rev1900.Double Pocket Coal Chute BillMtl.Iszley.tif
  
CoalS-36-333/2/1899n/aStandard Plan of Double Pocket Coal Chute - Storage PlanGenera Plan, Section, Bill of Material
not listed
NPM. Iszley18x24Chief EngineerS-36-33.1899.Double Pocket Coal Chute Storage Plan.Iszley.tif
  
WaterS-37-108/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsBill of Material and Details
S-37-7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-37-10.1898.FM Submerged Water Station Details.Iszley.tif
  
WaterS-37-137/31/19013/11/1904Standard Plan of High Tank Frame 48000 Gall. CapacityElevations, Plan View, Frost Chamber, Details
S-37-3, 5, 13 & 14
NPM. Iszley18x24Chief EngineerS-37-13.1901.rev1904.High Tank Frame 48000-gal.Iszley.tif
  
WaterS-37-147/31/19013/11/1904Standard Plan of High Tank Frame 48000 Gall. Capacity Bill of Material and DetailsBill of Material, Details of cast iron parts
S-37-3, 5, 13 & 14
NPM. Iszley18x24Chief EngineerS-37-14.1901.rev1904.High Tank Frame 48000-gal Details BillMtl.Iszley.tif
  
WaterS-37-155/23/19002/19/1904Standard Plan of Water Tank 100000 Gals Capacity - With High FramePlan Views, Elevation, Section Through Manhole
S-37-15, 16, 17
NPM. Iszley18x24Chief EngineerS-37-15.1900.rev1904.100000-gal Water Tank High Frame.Iszley.tif
  
WaterS-37-165/23/1900n/aStandard Plan showing Details of Water Tank 100000 Gals Capacity - With High FrameDetails, Roof Plan, Tank Bands, Fittings
S-37-15, 16, 17
NPM. Iszley18x24Chief EngineerS-37-16.1900.100000-gal Water Tank High Frame.Iszley.tif
  
WaterS-37-175/23/19002/19/1904Standard Plan of Water Tank 100000 Gals Capacity - With High Frame Bill of MaterialBill of Material, Detail of Kingpost
S-37-15, 16, 17
NPM. Iszley18x24Chief EngineerS-37-17.1900.rev1904.100000-gal Water Tank High Frame BillMtl.Iszley.tif
  
WaterS-37-411/13/1900n/aStandard Plan of Water Tank 48000 Gall CapacityGround Plan of Foundation and Frost Chamber
S-37-3, 4, 5 & 6
NPM. Iszley18x24Chief EngineerS-37-4.1900.48000-gal Water Tank.Iszley.tif
  
WaterS-37-511/13/1900n/aStandard Plan of Water Tank 48000 Gall CapacityTank Roof with and without Frostproof Ceiling, Section
S-37-3, 4, 5 & 6
NPM. Iszley18x24Chief EngineerS-37-5.1900.48000-gal Water Tank.Iszley.tif
  
WaterS-37-507/29/1905n/aStandard Plan of Sizes and Location of Stand PipesPlan View, Cross Section, Longitudinal Section, General Rules and Dimensions
None Listed
NPM. Iszley18x24Chief EngineerS-37-50.1905.Sizes and Location of Standpipes.Iszley.tif
  
WaterS-37-611/13/1900n/aStandard Plan of 48000 Gallons Water Tank Bill of Materail and DetailsBill of Material and Details of Cast Iron Parts
S-37-3, 4, 5 & 6
NPM. Iszley18x24Chief EngineerS-37-6.1900.48000-gal Water Tank Details BillMtl.Iszley.tif
  
WaterS-37-78/1/1898n/aStandard Plan of Submerged Water Station As Manufactured by Fairbanks Morse & Co. St. PaulGround Plan, Sections
S-37-7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-37-7.1898.FM Submerged Water Station.Iszley.tif
  
WaterS-37-88/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsHardware Details
S-37-7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-37-8.1898.FM Submerged Water Station.Iszley.tif
  
WaterS-37-98/1/1898n/aStandard Plan of Submerged Water Station  As Manufactured by Fairbanks Morse & Co. St. Paul - DetailsHardware Details for Tank, Tank Lug, Float,  Relief Valve, Various Fittings
S-37-7, 8, 9 & 10
NPM. Iszley18x24Chief EngineerS-37-9.1898.FM Submerged Water Station Details.Iszley.tif
  
FenceS-38-19/7/1904n/aStandard Plan of Fence and GateElevations of Gates and Right-of-Way fences with Synopsis of Laws pertaining to Fencing of Railroads as of  Jan19th, 1904
None Listed
NPM. Iszley18x24Chief EngineerS-38-1.1904.ROW Fence and Gate.Iszley.tif
  
FenceS-38-108/13/1903n/aStandard Plan of Station Ground FenceElevations of Fence, Small and Dreiveway Gates, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerS-38-10.1903.Station Ground Fence.Iszley.tif
  
Section HouseS-39-604/7/19042/10/1905Standard Plan of Section House - Two StoryElevations, Section, Foundation and Cellar Plan
S-39*60 and 61
NPM. Iszley18x24Chief EngineerS-39-60.1904.rev1905.Section House 2-Story.Iszley.tif
  
Section HouseS-39-614/7/19042/10/1905Standard Plan of Section House - Two StoryFirst and Second Floor Plans, Bill of Material
S-39*60 and 61
NPM. Iszley18x24Chief EngineerS-39-61.1904.rev1905.Section House 2-Story BillMtl.Iszley.tif
  
Section HouseS-39-804/4/19051/22/1906Standard Plan of Bunk House for 16 Men with Living RoomGround Plan, Elevations, Cross Section, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerS-39-80.1905.rev1906.Bunk House.Iszley.tif
  
FenceS-40-112/7/189811/6/1905Standard Plan of Snow FencesFront and Side Elevations for Permanent and Portable Snow Fence, Bill of Material
Complete
NPM. Iszley18x24Chief EngineerS-40-1.1898.rev1905.Snow Fence.Iszley.tif
  
ROW and TrackT-16-13/20/1900n/aStandard Plan of RoadbedsCross  Sections of Single and Double Track Roadbeds with different types of Ballast
Complete
NPM. Iszley18x24Chief EngineerT-16-1.1900.Roadbeds.Iszley.tif
  
ROW and TrackT-18-112/28/18897/7/1904Standard Plan of Switch StandsSwitch Stand Details for Split and Stub Switches
Complete
NPM. Iszley18x24Chief EngineerT-18-1.1889.rev1904.Switch Stands.Iszley.tif
  
ROW and TrackT-18-1012/7/1898n/aStandard Plan ofDouble Slip Switch No 8Plan View and Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-10.1898.Double Slip Switch No 8.Iszley.tif
  
ROW and TrackT-18-109Jan. 191212/10/1915Standard Plan of No. 11 Turnout with Spring Rail Frog and 33 ft. RailsGround Plan, Section, Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-109.1912.rev1915.No 11 Turnout with Spring Frog.Iszley.tif
  
ROW and TrackT-18-1112/7/1898n/aStandard Plan ofDouble Slip Switch No 9Plan View and Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-11.1900.Double Slip Switch No 9.Iszley.tif
  
ROW and TrackT-18-1111/16/19125/27/1921Standard Plan of No. 11 Spring Rail Frog for 85 lbs., 90 lbs., and 100 lbs. RailsGeneral Plan, Details, Details Dimensions
None Listed
NPM. Iszley18x24Chief EngineerT-18-111.1912.rev1921.No 14 Spring Rail Frog.Iszley.tif
  
ROW and TrackT-18-118Apr. 1913n/aStandard Plan of No. 16 Turnout with Rigid Frog and 33 ft. RailsGround Plan, Section, Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-118.1913.No 16 Turnout with Rigid Frog.Iszley.tif
  
ROW and TrackT-18-119Dec. 191210/1/1916Standard Plan of 33'-0" Split Switch for 85 Lb, 90 Lb & 100 Lb RailsGeneral Plan, Table of Dimensions, Details for split switch points
None Listed
NPM. Iszley18x24Chief EngineerT-18-119.1912.rev1916.Split Switch Points.Iszley.tif
  
ROW and TrackT-18-125/1/1900n/aStandard Plan of Tie Plates and SpikeTop and End View for Q&W, Servis, amd Glendon Tie Plates, and Spike
None Listed
NPM. Iszley18x24Chief EngineerT-18-12.1900.Tie Plates and Spike.Iszley.tif
  
ROW and TrackT-18-120Dec. 1912Sept. 1916Standard Plan of No. 16 Rigid Bolted Frog for  85 Lb, 90 Lb & 100 Lb RailsGeneral Plan, Table of Dimensions, Sections
None Listed
NPM. Iszley18x24Chief EngineerT-18-120.1912.rev1916.No 16 Rigid Bolted Frog.Iszley.tif
  
ROW and TrackT-18-13011/13/1913n/aStandard Plan of No. 9 Spring Rail Frog for 85 Lbs RailGeneral Plan, General Dimensions, Sections, Details
None Listed
NPM. Iszley18x24Chief EngineerT-18-130.1913.No 9 Spring Rail Frog.Iszley.tif
  
ROW and TrackT-18-1A12/28/18899/18/1905Standard Plan of Switch StandsSwitch Stand Details for Split and Stub Switches
Complete
NPM. Iszley18x24Chief EngineerT-18-1A.1889.rev1905.Switch Stands.Iszley.tif
  
ROW and TrackT-18-212/7/1898n/aStandard Plan of Guard Rail and FrogsStandard Frog  and Guard Rail Angles and Details
Complete
NPM. Iszley18x24Chief EngineerT-18-2.1898.Guard Rails and Frogs.Iszley.tif
  
ROW and TrackT-18-204/14/1904n/aStandard Plan of Split Switch with Additional Connection to a Ground throw StandPlan View and Cross Section
None Listed
NPM. Iszley18x24Chief EngineerT-18-20.1904.Split Switch and Ground Throw Conn.Iszley.tif
  
ROW and TrackT-18-255/12/1904n/aStandard Plan of Jack Knife Switch Lever with Lamp Stand ConnectionGround Plan, Side Elevation and Detail
None Listed
NPM. Iszley18x24Chief EngineerT-18-25.1904.Switch Lever.Iszley.tif
  
ROW and TrackT-18-34/DN-14/30/1909n/aStandard Plan of Passing Track DerailOld No. 10; Ground Plan, Standard High Switch Tower, Derail Target, Details
None Listed
NPM. Iszley18x24Chief EngineerT-18-34.DN-1.1909.Passing Track Derail.Iszley.tif
  
ROW and TrackT-18-34A/DN-310/18/19066/20/1911Side Track Derail Connected With Main Line SwitchOld No B-30; Ground Plan, Arrangement of Connections to Switch, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerT-18-34A.DN-3.1906.rev1911.Derail Switch.Iszley.tif
  
ROW and TrackT-18-612/7/18986/6/1903Standard Plan of Split SwitchesPlan View of No. 9 and 10 Split Switches with Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-6.1898.rev1903.Split Switches.Iszley.tif
  
ROW and TrackT-18-72/16/18916/30/1891Standard Plan of Points for Split SwitchPlan View and Tie Bar Details
None Listed
NPM. Iszley18x24Chief EngineerT-18-7.1891.rev1891.Points for Split Switches.Iszley.tif
  
ROW and TrackT-18-7A12/7/1898n/aStandard Plan of No. 9 Spring Rail Frog as Manufactured by Ajax Forge Co., Chicago, ILL.Plan View and Detail Parts
Complete
NPM. Iszley18x24Chief EngineerT-18-7A.1898.No 9 Spring Rail Frog.Iszley.tif
  
ROW and TrackT-18-812/7/1898n/aStandard Plan ofDouble Slip Switch No 6 1/2Plan View and Bill of Ties
None Listed
NPM. Iszley18x24Chief EngineerT-18-8.1898.Double Slip Switch No 6.5.Iszley.tif
  
ROW and TrackT-19-29/29/1926n/aStandard Plan Lifting Derail 72 Lb NP Against 85 Lb ASCE, 90 Lb ARA-B & 100 Lb RE Rail General Plan, Rod Sections, details, Tables of Dimensions, Bill of Material
None Listed
NPM. Iszley18x24Chief EngineerT-19-2.1926.Lifting Derail.Iszley.tif
  
ROW and TrackT-20-112/7/1898n/aStandard Plan of Steel RailLongitudinal and Cross Sections for 56 Lb and 66 Lb Rail
Complete
NPM. Iszley18x24Chief EngineerT-20-1.1898.56 and 66 lb Steel Rail.Iszley.tif
  
ROW and TrackT-20-23/2/1898n/aStandard Plan of 72 Lbs Steel Rail and Joint FasteningsAngle Bar, Longitudinal and Cross Sections for 72 Lb Rail
Complete - 1 sheet
NPM. Iszley18x24Chief EngineerT-20-2.1898.72 lb Steel Rail.Iszley.tif
  
ROW and TrackT-20-37/3/1902n/aStandard Plan of 85 Lbs Steel Rail and Joint Fastenings Angle Bar, Longitudinal and Cross Sections for 85 Lb Rail
Complete - 1 sheet
NPM. Iszley18x24Chief EngineerT-20-3.1902.85 lb Steel Rail.Iszley.tif
  
ROW and TrackT-21-112/7/1898n/aStandard Plan of Joint FasteningsLongitudinal and Cross Sections of Angle Bars for 56 Lb and 66 Lb Rail
Complete
NPM. Iszley18x24Chief EngineerT-21-1.1898.Joint Fastenings.Iszley.tif